Terrestrial Energy

Listed developer of the Integral Molten Salt Reactor. Its IMSR400 plant pairs two 195 MWe reactors and targets grid power, industrial heat and data centers.

HQ US Molten saltListed

Verified

Visit Terrestrial Energy Compare with others Request a quote

195 MWe↗Per module
Design reviewLicensing stage

Facts

Source per value
DesignThe company's lead reactor design name(s) as the company or its regulator names them; semicolon-separated when it markets more than one.
IMSR400 (two IMSR units) 3
TypeReactor coolant/technology family. Gas-cooled fast is separated from thermal HTGR designs; sodium-cooled includes both fast and thermal-spectrum designs.
Molten salt 1
Size classDerived from published electric output per module: Micro is 20 MWe or less, Small is above 20 and up to 300 MWe, Medium is above 300 MWe. Legacy heat-only classifications use one third of thermal output as an explicit comparison convention, not a claimed electric rating.
Small 3
MWe / module MWeNet (or gross where only gross is published) electric output of one reactor module as the company or its regulator publishes it. Null for heat-only designs.
195 3
MWt / module MWtThermal output of one reactor module as published by the company or its regulator.
Not published
FuelFuel form and enrichment class as published (for example LEU UO2, HALEU TRISO, fuel salt).
LEU fuel salt 3
Licensing stageFurthest licensing milestone reached with any national regulator: Operating; Construction licensed (construction permit or licence issued); DOE test authorization (a test reactor authorized or built under the US Department of Energy, for example the Reactor Pilot Program or the DOME test bed); Construction under review (construction, site or creation application filed); Design approved (design certification, standard design approval or GDA completed); Design review (formal design review under way, such as UK GDA, CNSC vendor design review or a French safety-options review); Pre-licensing (pre-application engagement only).
Design review 1
RegulatorsNational regulators the company has formally engaged (NRC, CNSC, ONR, ASN, and others), semicolon-separated.
CNSC; NRC 1
Licensing detailThe milestones behind the licensing stage, by regulator, with dates.
Completed Phase 2 of the CNSC vendor design review in April 2023 with no fundamental barriers to licensing. NRC has approved IMSR topical reports, including principal design criteria; no US construction permit application filed yet. 12
Latest milestoneDate of the milestone that sets the licensing stage (for example the day a construction permit was issued or an application docketed).
2023-04-01 1
First siteLocation of the first-of-a-kind commercial or demonstration unit, with the owner or host.
Texas A&M RELLIS campus, Bryan, Texas (77-acre ground lease, June 2026) 4
First powerYear the company or its host utility targets for first operation (criticality or commercial operation, as stated) of the first unit. A plan, not a guarantee.
Not published
OwnershipPublic (listed shares), Private (venture or privately held), Subsidiary (a unit or joint venture of a larger company) or State-owned.
Public 3
TickerExchange and ticker of the company or its listed parent.
NASDAQ: IMSR 3
ListedFirst trading day of the company's shares (or its listed parent's current ticker) on the exchange named in Ticker.
2025-10-29 2
FundingHeadline funding: equity raised, public listing, government cost-share awards (DOE ARDP, GAIN, Great British Nuclear and others), with amounts and dates.
Listed on Nasdaq on 2025-10-29 through a merger with HCM II Acquisition Corp. 3
Data-center dealTrue when the company has a signed, announced agreement (PPA, framework, MOU, investment or capacity reservation) with a hyperscaler or data-center operator.
Not published
Data-center partnersHyperscalers and data-center operators the company has a signed or announced agreement with, semicolon-separated.
Not published
Data-center dealsWhat each data-center or hyperscaler agreement covers: partner, type of agreement, capacity and date.
Not published
HQCountry of the company's headquarters.
United States 3
RegionHeadquarters region.
North America 3

Sources

  1. WNN: Terrestrial SMR completes Canadian pre-licensing review accessed 2026-11-11
  2. NRC approves IMSR principal design criteria accessed 2026-11-11
  3. Terrestrial Energy completes business combination accessed 2026-11-11
  4. ANS: Terrestrial and Texas A&M siting agreement accessed 2026-11-11

Get a quote from Terrestrial Energy and similar companies

Tell us what you need once. We send it to matching companies and they reply to you directly.

Quote requests open shortly. To get in first, email hello@smrcompanies.com.