Moltex Energy
Canadian developer of the SSR-W, a 300 MWe molten salt reactor that burns fuel recycled from CANDU spent fuel with its WATSS process, planned at Point Lepreau.
Facts
Source per value- DesignThe company's lead reactor design name(s) as the company or its regulator names them; semicolon-separated when it markets more than one.
- SSR-W (Stable Salt Reactor – Wasteburner) 1
- TypeReactor coolant/technology family. Gas-cooled fast is separated from thermal HTGR designs; sodium-cooled includes both fast and thermal-spectrum designs.
- Molten salt 1
- Size classDerived from published electric output per module: Micro is 20 MWe or less, Small is above 20 and up to 300 MWe, Medium is above 300 MWe. Legacy heat-only classifications use one third of thermal output as an explicit comparison convention, not a claimed electric rating.
- Small 3
- MWe / module MWeNet (or gross where only gross is published) electric output of one reactor module as the company or its regulator publishes it. Null for heat-only designs.
- 300 3
- MWt / module MWtThermal output of one reactor module as published by the company or its regulator.
- Not published
- FuelFuel form and enrichment class as published (for example LEU UO2, HALEU TRISO, fuel salt).
- Recycled spent-fuel salt (WATSS) 1
- Licensing stageFurthest licensing milestone reached with any national regulator: Operating; Construction licensed (construction permit or licence issued); DOE test authorization (a test reactor authorized or built under the US Department of Energy, for example the Reactor Pilot Program or the DOME test bed); Construction under review (construction, site or creation application filed); Design approved (design certification, standard design approval or GDA completed); Design review (formal design review under way, such as UK GDA, CNSC vendor design review or a French safety-options review); Pre-licensing (pre-application engagement only).
- Design review 2
- RegulatorsNational regulators the company has formally engaged (NRC, CNSC, ONR, ASN, and others), semicolon-separated.
- CNSC 2
- Licensing detailThe milestones behind the licensing stage, by regulator, with dates.
- Completed Phase 1 of the CNSC pre-licensing vendor design review in May 2021; Phase 2 under way. 2
- Latest milestoneDate of the milestone that sets the licensing stage (for example the day a construction permit was issued or an application docketed).
- 2021-05-01 2
- First siteLocation of the first-of-a-kind commercial or demonstration unit, with the owner or host.
- Point Lepreau, New Brunswick 3
- First powerYear the company or its host utility targets for first operation (criticality or commercial operation, as stated) of the first unit. A plan, not a guarantee.
- Not published
- OwnershipPublic (listed shares), Private (venture or privately held), Subsidiary (a unit or joint venture of a larger company) or State-owned.
- Private 2
- TickerExchange and ticker of the company or its listed parent.
- Not published
- ListedFirst trading day of the company's shares (or its listed parent's current ticker) on the exchange named in Ticker.
- Not published
- FundingHeadline funding: equity raised, public listing, government cost-share awards (DOE ARDP, GAIN, Great British Nuclear and others), with amounts and dates.
- Canada’s Strategic Innovation Fund invested $47.5 million, matched by Moltex, for SSR-W, WATSS and VDR Phase 2. 2
- Data-center dealTrue when the company has a signed, announced agreement (PPA, framework, MOU, investment or capacity reservation) with a hyperscaler or data-center operator.
- Not published
- Data-center partnersHyperscalers and data-center operators the company has a signed or announced agreement with, semicolon-separated.
- Not published
- Data-center dealsWhat each data-center or hyperscaler agreement covers: partner, type of agreement, capacity and date.
- Not published
- HQCountry of the company's headquarters.
- Canada 1
- RegionHeadquarters region.
- North America 1
Sources
- Moltex: WATSS–SSR-W fuel recycling vision accessed 2026-11-11
- ANS: Canada invests in Moltex SMR technology accessed 2026-11-11
- WNA: Canada outlook (Point Lepreau 300 MW MSR) accessed 2026-11-11
Get a quote from Moltex Energy and similar companies
Tell us what you need once. We send it to matching companies and they reply to you directly.