Kairos Power

Designs the KP-FHR, a fluoride-salt-cooled high-temperature reactor using TRISO pebble fuel, and builds its own demonstration plants in Oak Ridge, Tennessee. Google is its anchor customer.

HQ US Molten saltData-center dealConstruction approved

Verified

Visit Kairos Power Compare with others Request a quote

75 MWe↗Per module
2030↗First power target
Construction licensedLicensing stage

Facts

Source per value
DesignThe company's lead reactor design name(s) as the company or its regulator names them; semicolon-separated when it markets more than one.
KP-FHR; Hermes; Hermes 2 1
TypeReactor coolant/technology family. Gas-cooled fast is separated from thermal HTGR designs; sodium-cooled includes both fast and thermal-spectrum designs.
Molten salt 1
Size classDerived from published electric output per module: Micro is 20 MWe or less, Small is above 20 and up to 300 MWe, Medium is above 300 MWe. Legacy heat-only classifications use one third of thermal output as an explicit comparison convention, not a claimed electric rating.
Small 1
MWe / module MWeNet (or gross where only gross is published) electric output of one reactor module as the company or its regulator publishes it. Null for heat-only designs.
75 1
MWt / module MWtThermal output of one reactor module as published by the company or its regulator.
Not published
FuelFuel form and enrichment class as published (for example LEU UO2, HALEU TRISO, fuel salt).
TRISO pebbles 1
Licensing stageFurthest licensing milestone reached with any national regulator: Operating; Construction licensed (construction permit or licence issued); DOE test authorization (a test reactor authorized or built under the US Department of Energy, for example the Reactor Pilot Program or the DOME test bed); Construction under review (construction, site or creation application filed); Design approved (design certification, standard design approval or GDA completed); Design review (formal design review under way, such as UK GDA, CNSC vendor design review or a French safety-options review); Pre-licensing (pre-application engagement only).
Construction licensed 2
RegulatorsNational regulators the company has formally engaged (NRC, CNSC, ONR, ASN, and others), semicolon-separated.
NRC 2
Licensing detailThe milestones behind the licensing stage, by regulator, with dates.
NRC issued construction permits for Hermes 2 on 2024-11-21 (after Hermes in 2023); Kairos plans to run Hermes 2 as one 50 MWe reactor and broke ground in April 2026. 23
Latest milestoneDate of the milestone that sets the licensing stage (for example the day a construction permit was issued or an application docketed).
2024-11-21 2
First siteLocation of the first-of-a-kind commercial or demonstration unit, with the owner or host.
Hermes 2, Oak Ridge, Tennessee: 50 MWe sold to TVA 34
First powerYear the company or its host utility targets for first operation (criticality or commercial operation, as stated) of the first unit. A plan, not a guarantee.
2,030 4
OwnershipPublic (listed shares), Private (venture or privately held), Subsidiary (a unit or joint venture of a larger company) or State-owned.
Private 4
TickerExchange and ticker of the company or its listed parent.
Not published
ListedFirst trading day of the company's shares (or its listed parent's current ticker) on the exchange named in Ticker.
Not published
FundingHeadline funding: equity raised, public listing, government cost-share awards (DOE ARDP, GAIN, Great British Nuclear and others), with amounts and dates.
Not published
Data-center dealTrue when the company has a signed, announced agreement (PPA, framework, MOU, investment or capacity reservation) with a hyperscaler or data-center operator.
Yes 4
Data-center partnersHyperscalers and data-center operators the company has a signed or announced agreement with, semicolon-separated.
Google 4
Data-center dealsWhat each data-center or hyperscaler agreement covers: partner, type of agreement, capacity and date.
Google agreement (October 2024) for 500 MW by 2035. TVA PPA (2025-08-18) for up to 50 MW from Hermes 2 onto the grid that serves Google data centers, the first US utility PPA for a Gen IV reactor. 4
HQCountry of the company's headquarters.
United States 4
RegionHeadquarters region.
North America 4

Sources

  1. Kairos Power: iterative development accessed 2026-11-11
  2. NRC: Hermes 2 permits issued 21 November 2024 accessed 2026-11-11
  3. Kairos: April 2026 Hermes 2 groundbreaking accessed 2026-11-11
  4. Kairos: Google and TVA collaboration and PPA accessed 2026-11-11

Get a quote from Kairos Power and similar companies

Tell us what you need once. We send it to matching companies and they reply to you directly.

Quote requests open shortly. To get in first, email hello@smrcompanies.com.