Kairos Power
Designs the KP-FHR, a fluoride-salt-cooled high-temperature reactor using TRISO pebble fuel, and builds its own demonstration plants in Oak Ridge, Tennessee. Google is its anchor customer.
Facts
Source per value- DesignThe company's lead reactor design name(s) as the company or its regulator names them; semicolon-separated when it markets more than one.
- KP-FHR; Hermes; Hermes 2 1
- TypeReactor coolant/technology family. Gas-cooled fast is separated from thermal HTGR designs; sodium-cooled includes both fast and thermal-spectrum designs.
- Molten salt 1
- Size classDerived from published electric output per module: Micro is 20 MWe or less, Small is above 20 and up to 300 MWe, Medium is above 300 MWe. Legacy heat-only classifications use one third of thermal output as an explicit comparison convention, not a claimed electric rating.
- Small 1
- MWe / module MWeNet (or gross where only gross is published) electric output of one reactor module as the company or its regulator publishes it. Null for heat-only designs.
- 75 1
- MWt / module MWtThermal output of one reactor module as published by the company or its regulator.
- Not published
- FuelFuel form and enrichment class as published (for example LEU UO2, HALEU TRISO, fuel salt).
- TRISO pebbles 1
- Licensing stageFurthest licensing milestone reached with any national regulator: Operating; Construction licensed (construction permit or licence issued); DOE test authorization (a test reactor authorized or built under the US Department of Energy, for example the Reactor Pilot Program or the DOME test bed); Construction under review (construction, site or creation application filed); Design approved (design certification, standard design approval or GDA completed); Design review (formal design review under way, such as UK GDA, CNSC vendor design review or a French safety-options review); Pre-licensing (pre-application engagement only).
- Construction licensed 2
- RegulatorsNational regulators the company has formally engaged (NRC, CNSC, ONR, ASN, and others), semicolon-separated.
- NRC 2
- Licensing detailThe milestones behind the licensing stage, by regulator, with dates.
- NRC issued construction permits for Hermes 2 on 2024-11-21 (after Hermes in 2023); Kairos plans to run Hermes 2 as one 50 MWe reactor and broke ground in April 2026. 23
- Latest milestoneDate of the milestone that sets the licensing stage (for example the day a construction permit was issued or an application docketed).
- 2024-11-21 2
- First siteLocation of the first-of-a-kind commercial or demonstration unit, with the owner or host.
- Hermes 2, Oak Ridge, Tennessee: 50 MWe sold to TVA 34
- First powerYear the company or its host utility targets for first operation (criticality or commercial operation, as stated) of the first unit. A plan, not a guarantee.
- 2,030 4
- OwnershipPublic (listed shares), Private (venture or privately held), Subsidiary (a unit or joint venture of a larger company) or State-owned.
- Private 4
- TickerExchange and ticker of the company or its listed parent.
- Not published
- ListedFirst trading day of the company's shares (or its listed parent's current ticker) on the exchange named in Ticker.
- Not published
- FundingHeadline funding: equity raised, public listing, government cost-share awards (DOE ARDP, GAIN, Great British Nuclear and others), with amounts and dates.
- Not published
- Data-center dealTrue when the company has a signed, announced agreement (PPA, framework, MOU, investment or capacity reservation) with a hyperscaler or data-center operator.
- Yes 4
- Data-center partnersHyperscalers and data-center operators the company has a signed or announced agreement with, semicolon-separated.
- Google 4
- Data-center dealsWhat each data-center or hyperscaler agreement covers: partner, type of agreement, capacity and date.
- Google agreement (October 2024) for 500 MW by 2035. TVA PPA (2025-08-18) for up to 50 MW from Hermes 2 onto the grid that serves Google data centers, the first US utility PPA for a Gen IV reactor. 4
- HQCountry of the company's headquarters.
- United States 4
- RegionHeadquarters region.
- North America 4
Sources
- Kairos Power: iterative development accessed 2026-11-11
- NRC: Hermes 2 permits issued 21 November 2024 accessed 2026-11-11
- Kairos: April 2026 Hermes 2 groundbreaking accessed 2026-11-11
- Kairos: Google and TVA collaboration and PPA accessed 2026-11-11