Natura Resources

Texas developer of liquid-fuelled molten salt reactors. Its 1 MWt MSR-1 at Abilene Christian University holds an NRC construction permit issued in 2024; the MSR-100 is the 100 MWe commercial design.

HQ US Molten saltConstruction approved

Verified

Visit Natura Resources Compare with others Request a quote

100 MWe↗+Per module
Construction licensedLicensing stage

Facts

Source per value
DesignThe company's lead reactor design name(s) as the company or its regulator names them; semicolon-separated when it markets more than one.
MSR-1; MSR-100 1
TypeReactor coolant/technology family. Gas-cooled fast is separated from thermal HTGR designs; sodium-cooled includes both fast and thermal-spectrum designs.
Molten salt 3
Size classDerived from published electric output per module: Micro is 20 MWe or less, Small is above 20 and up to 300 MWe, Medium is above 300 MWe. Legacy heat-only classifications use one third of thermal output as an explicit comparison convention, not a claimed electric rating.
Small 12
MWe / module MWeNet (or gross where only gross is published) electric output of one reactor module as the company or its regulator publishes it. Null for heat-only designs.
100 12
MWt / module MWtThermal output of one reactor module as published by the company or its regulator.
Not published
FuelFuel form and enrichment class as published (for example LEU UO2, HALEU TRISO, fuel salt).
Uranium dissolved in fuel salt 23
Licensing stageFurthest licensing milestone reached with any national regulator: Operating; Construction licensed (construction permit or licence issued); DOE test authorization (a test reactor authorized or built under the US Department of Energy, for example the Reactor Pilot Program or the DOME test bed); Construction under review (construction, site or creation application filed); Design approved (design certification, standard design approval or GDA completed); Design review (formal design review under way, such as UK GDA, CNSC vendor design review or a French safety-options review); Pre-licensing (pre-application engagement only).
Construction licensed 3
RegulatorsNational regulators the company has formally engaged (NRC, CNSC, ONR, ASN, and others), semicolon-separated.
NRC 3
Licensing detailThe milestones behind the licensing stage, by regulator, with dates.
NRC issued ACU’s MSR-1 construction permit on 2024-09-16. The 1 MWt research reactor does not generate electricity; the 100 MWe rating belongs to the separate commercial MSR-100 design. 34
Latest milestoneDate of the milestone that sets the licensing stage (for example the day a construction permit was issued or an application docketed).
2024-09-16 3
First siteLocation of the first-of-a-kind commercial or demonstration unit, with the owner or host.
Abilene Christian University, Abilene, Texas (MSR-1); Texas A&M RELLIS (MSR-100) 124
First powerYear the company or its host utility targets for first operation (criticality or commercial operation, as stated) of the first unit. A plan, not a guarantee.
Not published
OwnershipPublic (listed shares), Private (venture or privately held), Subsidiary (a unit or joint venture of a larger company) or State-owned.
Private 2
TickerExchange and ticker of the company or its listed parent.
Not published
ListedFirst trading day of the company's shares (or its listed parent's current ticker) on the exchange named in Ticker.
Not published
FundingHeadline funding: equity raised, public listing, government cost-share awards (DOE ARDP, GAIN, Great British Nuclear and others), with amounts and dates.
Not published
Data-center dealTrue when the company has a signed, announced agreement (PPA, framework, MOU, investment or capacity reservation) with a hyperscaler or data-center operator.
Not published
Data-center partnersHyperscalers and data-center operators the company has a signed or announced agreement with, semicolon-separated.
Not published
Data-center dealsWhat each data-center or hyperscaler agreement covers: partner, type of agreement, capacity and date.
Not published
HQCountry of the company's headquarters.
United States 2
RegionHeadquarters region.
North America 2

Sources

  1. ACU: MSR-1 demonstration and separate 100 MWe commercial systems accessed 2026-11-11
  2. Power Engineering: Natura eyes Texas for two projects accessed 2026-11-11
  3. NRC: ACU construction permit; liquid-fuelled non-power research reactor accessed 2026-11-11
  4. ACU NEXT Lab FAQ: operation targeted by end of 2026 accessed 2026-11-11

Get a quote from Natura Resources and similar companies

Tell us what you need once. We send it to matching companies and they reply to you directly.

Quote requests open shortly. To get in first, email hello@smrcompanies.com.