Methodology
Primary sources, one link per number, a date on every row.
Where the data comes from
Licensing facts come from the regulator first: NRC project pages and dockets, CNSC, ONR, France’s ASNR, STUK, NSSC and Rostekhnadzor, plus DOE announcements for test reactors. Design, output and deal facts come from the company’s own releases, SEC and exchange filings and utility announcements, then named trade press (World Nuclear News, ANS Nuclear Newswire, NucNet, POWER, Data Center Dynamics). Every record lists its sources with the date we accessed them, and every value in the table links to the source it came from.
How we verify
Each row shows the date we last checked it. A field is filled only when a source states it; when a company does not publish a figure, the cell stays empty. MWe is per reactor module, as the company or regulator states it; plant totals sit in the text. The licensing stage is the furthest formal milestone with any regulator, and its date is the day that milestone happened. First-power years are the company’s or host utility’s stated target. A data-center deal means a signed or announced agreement with a named hyperscaler or data-center operator; a stated interest in the market does not count. A company enters the table only with at least three sourced fields beyond name, URL and summary.
Which companies qualify
We include companies developing their own reactor designs, including microreactors, heat reactors and advanced designs above the usual SMR size threshold. Each needs at least three sourced technical or commercial fields beyond name, URL and summary. Project developers that procure other companies’ designs are outside this table: Kärnfull Next, Elementl Power, The Nuclear Company and Blue Energy. Their projects can still appear in a reactor designer’s deal notes.
Studsvik describes Kärnfull Next as a site and project developer; Elementl describes technology-agnostic selection; The Nuclear Company describes delivery of Westinghouse technology. All accessed 11 November 2026.
Conflicting specifications and targets
The current product specification takes precedence over older promotional material. Holtec’s product page and the NRC state approximately 340 MWe per SMR-300, while its FAQ still states 320 MWe. We use the current net specification. Natura’s end-of-2026 operation target refers to its non-power MSR-1 demonstration, distinct from its 100 MWe commercial design. An unreported grid-connection date remains empty, as for Linglong One. The source notes retain these distinctions.
Corrections
Vendors and readers can send corrections to hello@smrcompanies.com with a public source. We update the row and its verified date. Featured placement is paid and labelled; it never changes a row’s data or its position in the sorted table.
Reuse
The dataset is free to reuse under CC BY 4.0 with a link to smrcompanies.com. Download it as CSV or JSON.
Field definitions
21 fields- Design
- The company's lead reactor design name(s) as the company or its regulator names them; semicolon-separated when it markets more than one.
- Type
- Reactor coolant/technology family. Gas-cooled fast is separated from thermal HTGR designs; sodium-cooled includes both fast and thermal-spectrum designs.
- Size class
- Derived from published electric output per module: Micro is 20 MWe or less, Small is above 20 and up to 300 MWe, Medium is above 300 MWe. Legacy heat-only classifications use one third of thermal output as an explicit comparison convention, not a claimed electric rating.
- MWe / module MWe
- Net (or gross where only gross is published) electric output of one reactor module as the company or its regulator publishes it. Null for heat-only designs.
- MWt / module MWt
- Thermal output of one reactor module as published by the company or its regulator.
- Fuel
- Fuel form and enrichment class as published (for example LEU UO2, HALEU TRISO, fuel salt).
- Licensing stage
- Furthest licensing milestone reached with any national regulator: Operating; Construction licensed (construction permit or licence issued); DOE test authorization (a test reactor authorized or built under the US Department of Energy, for example the Reactor Pilot Program or the DOME test bed); Construction under review (construction, site or creation application filed); Design approved (design certification, standard design approval or GDA completed); Design review (formal design review under way, such as UK GDA, CNSC vendor design review or a French safety-options review); Pre-licensing (pre-application engagement only).
- Regulators
- National regulators the company has formally engaged (NRC, CNSC, ONR, ASN, and others), semicolon-separated.
- Licensing detail
- The milestones behind the licensing stage, by regulator, with dates.
- Latest milestone
- Date of the milestone that sets the licensing stage (for example the day a construction permit was issued or an application docketed).
- First site
- Location of the first-of-a-kind commercial or demonstration unit, with the owner or host.
- First power
- Year the company or its host utility targets for first operation (criticality or commercial operation, as stated) of the first unit. A plan, not a guarantee.
- Ownership
- Public (listed shares), Private (venture or privately held), Subsidiary (a unit or joint venture of a larger company) or State-owned.
- Ticker
- Exchange and ticker of the company or its listed parent.
- Listed
- First trading day of the company's shares (or its listed parent's current ticker) on the exchange named in Ticker.
- Funding
- Headline funding: equity raised, public listing, government cost-share awards (DOE ARDP, GAIN, Great British Nuclear and others), with amounts and dates.
- Data-center deal
- True when the company has a signed, announced agreement (PPA, framework, MOU, investment or capacity reservation) with a hyperscaler or data-center operator.
- Data-center partners
- Hyperscalers and data-center operators the company has a signed or announced agreement with, semicolon-separated.
- Data-center deals
- What each data-center or hyperscaler agreement covers: partner, type of agreement, capacity and date.
- HQ
- Country of the company's headquarters.
- Region
- Headquarters region.