TerraPower

Designs Natrium, a 345 MWe sodium-cooled fast reactor with molten-salt storage that can boost output to 500 MWe. Its first plant is under construction at Kemmerer, Wyoming.

HQ US Sodium-cooledData-center dealConstruction approved

Verified

Visit TerraPower Compare with others Request a quote

345 MWe↗Per module
840 MWt↗Per module
2030↗First power target
Construction licensedLicensing stage

Facts

Source per value
DesignThe company's lead reactor design name(s) as the company or its regulator names them; semicolon-separated when it markets more than one.
Natrium 2
TypeReactor coolant/technology family. Gas-cooled fast is separated from thermal HTGR designs; sodium-cooled includes both fast and thermal-spectrum designs.
Sodium-cooled 12
Size classDerived from published electric output per module: Micro is 20 MWe or less, Small is above 20 and up to 300 MWe, Medium is above 300 MWe. Legacy heat-only classifications use one third of thermal output as an explicit comparison convention, not a claimed electric rating.
Medium 2
MWe / module MWeNet (or gross where only gross is published) electric output of one reactor module as the company or its regulator publishes it. Null for heat-only designs.
345 2
MWt / module MWtThermal output of one reactor module as published by the company or its regulator.
840 1
FuelFuel form and enrichment class as published (for example LEU UO2, HALEU TRISO, fuel salt).
Not published
Licensing stageFurthest licensing milestone reached with any national regulator: Operating; Construction licensed (construction permit or licence issued); DOE test authorization (a test reactor authorized or built under the US Department of Energy, for example the Reactor Pilot Program or the DOME test bed); Construction under review (construction, site or creation application filed); Design approved (design certification, standard design approval or GDA completed); Design review (formal design review under way, such as UK GDA, CNSC vendor design review or a French safety-options review); Pre-licensing (pre-application engagement only).
Construction licensed 12
RegulatorsNational regulators the company has formally engaged (NRC, CNSC, ONR, ASN, and others), semicolon-separated.
NRC 12
Licensing detailThe milestones behind the licensing stage, by regulator, with dates.
TerraPower announced the NRC Commission vote on 2026-03-04. The NRC project schedule records the construction-permit decision as 2026-03-09. Kemmerer Unit 1 is a commercial sodium-cooled Natrium demonstration plant; construction approval does not authorize operation. 12
Latest milestoneDate of the milestone that sets the licensing stage (for example the day a construction permit was issued or an application docketed).
2026-03-09 12
First siteLocation of the first-of-a-kind commercial or demonstration unit, with the owner or host.
Kemmerer, Wyoming (Kemmerer Unit 1), next to a retiring coal plant 12
First powerYear the company or its host utility targets for first operation (criticality or commercial operation, as stated) of the first unit. A plan, not a guarantee.
2,030 2
OwnershipPublic (listed shares), Private (venture or privately held), Subsidiary (a unit or joint venture of a larger company) or State-owned.
Private 3
TickerExchange and ticker of the company or its listed parent.
Not published
ListedFirst trading day of the company's shares (or its listed parent's current ticker) on the exchange named in Ticker.
Not published
FundingHeadline funding: equity raised, public listing, government cost-share awards (DOE ARDP, GAIN, Great British Nuclear and others), with amounts and dates.
$650 million round with NVentures (Nvidia) in 2025; DOE Advanced Reactor Demonstration Program cost-share for Kemmerer. 3
Data-center dealTrue when the company has a signed, announced agreement (PPA, framework, MOU, investment or capacity reservation) with a hyperscaler or data-center operator.
Yes 4
Data-center partnersHyperscalers and data-center operators the company has a signed or announced agreement with, semicolon-separated.
Meta; Sabey Data Centers 45
Data-center dealsWhat each data-center or hyperscaler agreement covers: partner, type of agreement, capacity and date.
Meta agreement (2026-01-09) for up to eight Natrium plants: two new units plus rights to six more, up to 2.8 GW (4 GW with storage). Sabey Data Centers signed an MOU on Natrium deployment on 2025-01-21. 45
HQCountry of the company's headquarters.
United States 2
RegionHeadquarters region.
North America 2

Sources

  1. NRC: Kemmerer construction-permit decision, 9 March 2026 accessed 2026-11-11
  2. TerraPower: NRC approves Natrium construction permit accessed 2026-11-11
  3. Power Engineering: TerraPower funding accessed 2026-11-11
  4. TerraPower and Meta agreement for 8 Natrium plants accessed 2026-11-11
  5. TerraPower and Sabey Data Centers accessed 2026-11-11

Get a quote from TerraPower and similar companies

Tell us what you need once. We send it to matching companies and they reply to you directly.

Quote requests open shortly. To get in first, email hello@smrcompanies.com.