Oklo
Listed developer of the Aurora powerhouse, a 75 MWe liquid-metal-cooled fast reactor sold as power, not hardware. It has announced data-center power deals with Meta, Switch and Equinix.
Facts
Source per value- DesignThe company's lead reactor design name(s) as the company or its regulator names them; semicolon-separated when it markets more than one.
- Aurora powerhouse 1
- TypeReactor coolant/technology family. Gas-cooled fast is separated from thermal HTGR designs; sodium-cooled includes both fast and thermal-spectrum designs.
- Sodium-cooled 1
- Size classDerived from published electric output per module: Micro is 20 MWe or less, Small is above 20 and up to 300 MWe, Medium is above 300 MWe. Legacy heat-only classifications use one third of thermal output as an explicit comparison convention, not a claimed electric rating.
- Small 1
- MWe / module MWeNet (or gross where only gross is published) electric output of one reactor module as the company or its regulator publishes it. Null for heat-only designs.
- 75 1
- MWt / module MWtThermal output of one reactor module as published by the company or its regulator.
- Not published
- FuelFuel form and enrichment class as published (for example LEU UO2, HALEU TRISO, fuel salt).
- Not published
- Licensing stageFurthest licensing milestone reached with any national regulator: Operating; Construction licensed (construction permit or licence issued); DOE test authorization (a test reactor authorized or built under the US Department of Energy, for example the Reactor Pilot Program or the DOME test bed); Construction under review (construction, site or creation application filed); Design approved (design certification, standard design approval or GDA completed); Design review (formal design review under way, such as UK GDA, CNSC vendor design review or a French safety-options review); Pre-licensing (pre-application engagement only).
- Pre-licensing 3
- RegulatorsNational regulators the company has formally engaged (NRC, CNSC, ONR, ASN, and others), semicolon-separated.
- NRC; DOE 2
- Licensing detailThe milestones behind the licensing stage, by regulator, with dates.
- NRC denied Oklo’s 2020 Aurora combined licence application in January 2022; Oklo completed an NRC readiness assessment for Phase 1 of a new application in July 2025. DOE approved the Aurora-INL preliminary documented safety analysis under the Reactor Pilot Program. 234
- Latest milestoneDate of the milestone that sets the licensing stage (for example the day a construction permit was issued or an application docketed).
- Not published
- First siteLocation of the first-of-a-kind commercial or demonstration unit, with the owner or host.
- Aurora-INL, Idaho National Laboratory 4
- First powerYear the company or its host utility targets for first operation (criticality or commercial operation, as stated) of the first unit. A plan, not a guarantee.
- 2,028 4
- OwnershipPublic (listed shares), Private (venture or privately held), Subsidiary (a unit or joint venture of a larger company) or State-owned.
- Public 3
- TickerExchange and ticker of the company or its listed parent.
- NYSE: OKLO 3
- ListedFirst trading day of the company's shares (or its listed parent's current ticker) on the exchange named in Ticker.
- 2024-05-10 8
- FundingHeadline funding: equity raised, public listing, government cost-share awards (DOE ARDP, GAIN, Great British Nuclear and others), with amounts and dates.
- Not published
- Data-center dealTrue when the company has a signed, announced agreement (PPA, framework, MOU, investment or capacity reservation) with a hyperscaler or data-center operator.
- Yes 5
- Data-center partnersHyperscalers and data-center operators the company has a signed or announced agreement with, semicolon-separated.
- Meta; Switch; Equinix 567
- Data-center dealsWhat each data-center or hyperscaler agreement covers: partner, type of agreement, capacity and date.
- Meta (2026-01-09): prepayment agreement for a 1.2 GW campus in Pike County, Ohio, first power as early as 2030. Switch (2024-12-18): non-binding 12 GW master power agreement through 2044. Equinix (2024-02-16): non-binding letter of intent for up to 500 MW, with a $25 million prepayment. 567
- HQCountry of the company's headquarters.
- United States 3
- RegionHeadquarters region.
- North America 3
Sources
- Utility Dive: Oklo 75 MW reactor design accessed 2026-11-11
- NRC: Aurora-Oklo application documents accessed 2026-11-11
- Oklo: NRC readiness assessment completed accessed 2026-11-11
- NucNet: Aurora-INL now expected in 2028 accessed 2026-11-11
- Oklo and Meta 1.2 GW agreement accessed 2026-11-11
- DCD: Switch to procure up to 12 GW from Oklo accessed 2026-11-11
- Data Center Frontier: Equinix nuclear deals accessed 2026-11-11
- Oklo 10-Q: OKLO commenced trading on NYSE on 10 May 2024 accessed 2026-11-11
Get a quote from Oklo and similar companies
Tell us what you need once. We send it to matching companies and they reply to you directly.