Westinghouse Electric Company

Reactor vendor behind the AP1000. It markets the AP300, a 375 MWe single-loop PWR built from AP1000 technology, and eVinci, a heat-pipe microreactor.

HQ US LWRData-center deal

Verified

Visit Westinghouse Electric Company Compare with others Request a quote

375 MWe↗Per module
990 MWt↗Per module
Pre-licensingLicensing stage

Facts

Source per value
DesignThe company's lead reactor design name(s) as the company or its regulator names them; semicolon-separated when it markets more than one.
AP300; eVinci 12
TypeReactor coolant/technology family. Gas-cooled fast is separated from thermal HTGR designs; sodium-cooled includes both fast and thermal-spectrum designs.
LWR 1
Size classDerived from published electric output per module: Micro is 20 MWe or less, Small is above 20 and up to 300 MWe, Medium is above 300 MWe. Legacy heat-only classifications use one third of thermal output as an explicit comparison convention, not a claimed electric rating.
Medium 1
MWe / module MWeNet (or gross where only gross is published) electric output of one reactor module as the company or its regulator publishes it. Null for heat-only designs.
375 1
MWt / module MWtThermal output of one reactor module as published by the company or its regulator.
990 1
FuelFuel form and enrichment class as published (for example LEU UO2, HALEU TRISO, fuel salt).
AP1000 fuel technology 1
Licensing stageFurthest licensing milestone reached with any national regulator: Operating; Construction licensed (construction permit or licence issued); DOE test authorization (a test reactor authorized or built under the US Department of Energy, for example the Reactor Pilot Program or the DOME test bed); Construction under review (construction, site or creation application filed); Design approved (design certification, standard design approval or GDA completed); Design review (formal design review under way, such as UK GDA, CNSC vendor design review or a French safety-options review); Pre-licensing (pre-application engagement only).
Pre-licensing 5
RegulatorsNational regulators the company has formally engaged (NRC, CNSC, ONR, ASN, and others), semicolon-separated.
NRC 5
Licensing detailThe milestones behind the licensing stage, by regulator, with dates.
NRC is engaged in pre-application activities for Westinghouse’s AP300 design certification application. eVinci is a separate design with its own NRC pre-application engagement; neither project page is a construction permit. 25
Latest milestoneDate of the milestone that sets the licensing stage (for example the day a construction permit was issued or an application docketed).
Not published
First siteLocation of the first-of-a-kind commercial or demonstration unit, with the owner or host.
AP300 in operation by the early 2030s (Westinghouse target) 3
First powerYear the company or its host utility targets for first operation (criticality or commercial operation, as stated) of the first unit. A plan, not a guarantee.
Not published
OwnershipPublic (listed shares), Private (venture or privately held), Subsidiary (a unit or joint venture of a larger company) or State-owned.
Subsidiary 46
TickerExchange and ticker of the company or its listed parent.
Not published
ListedFirst trading day of the company's shares (or its listed parent's current ticker) on the exchange named in Ticker.
Not published
FundingHeadline funding: equity raised, public listing, government cost-share awards (DOE ARDP, GAIN, Great British Nuclear and others), with amounts and dates.
Owned 51% by Brookfield and 49% by Cameco. Signed an $80 billion AP1000 deal with the US government in October 2025. 46
Data-center dealTrue when the company has a signed, announced agreement (PPA, framework, MOU, investment or capacity reservation) with a hyperscaler or data-center operator.
Yes 3
Data-center partnersHyperscalers and data-center operators the company has a signed or announced agreement with, semicolon-separated.
Data4 3
Data-center dealsWhat each data-center or hyperscaler agreement covers: partner, type of agreement, capacity and date.
Data4 selected the AP300 in March 2025 to evaluate deployment at one of its future European data centers (MoU). 3
HQCountry of the company's headquarters.
United States 3
RegionHeadquarters region.
North America 3

Sources

  1. Westinghouse: current AP300 data sheet, 375 MWe / 990 MWt accessed 2026-11-11
  2. Westinghouse: eVinci licensing milestone accessed 2026-11-11
  3. Westinghouse and Data4 accessed 2026-11-11
  4. ANS: Westinghouse $80B contract accessed 2026-11-11
  5. NRC: AP300 pre-application activities accessed 2026-11-11
  6. Cameco: Westinghouse ownership (49% Cameco, 51% Brookfield) accessed 2026-11-11

Get a quote from Westinghouse Electric Company and similar companies

Tell us what you need once. We send it to matching companies and they reply to you directly.

Quote requests open shortly. To get in first, email hello@smrcompanies.com.