ARC Clean Technology
Designs the ARC-100, a 100 MWe sodium-cooled fast reactor. NB Power plans the first unit at the Point Lepreau site in New Brunswick.
Visit ARC Clean Technology Compare with others Request a quote
Facts
Source per value- DesignThe company's lead reactor design name(s) as the company or its regulator names them; semicolon-separated when it markets more than one.
- ARC-100 1
- TypeReactor coolant/technology family. Gas-cooled fast is separated from thermal HTGR designs; sodium-cooled includes both fast and thermal-spectrum designs.
- Sodium-cooled 2
- Size classDerived from published electric output per module: Micro is 20 MWe or less, Small is above 20 and up to 300 MWe, Medium is above 300 MWe. Legacy heat-only classifications use one third of thermal output as an explicit comparison convention, not a claimed electric rating.
- Small 2
- MWe / module MWeNet (or gross where only gross is published) electric output of one reactor module as the company or its regulator publishes it. Null for heat-only designs.
- 100 2
- MWt / module MWtThermal output of one reactor module as published by the company or its regulator.
- Not published
- FuelFuel form and enrichment class as published (for example LEU UO2, HALEU TRISO, fuel salt).
- Not published
- Licensing stageFurthest licensing milestone reached with any national regulator: Operating; Construction licensed (construction permit or licence issued); DOE test authorization (a test reactor authorized or built under the US Department of Energy, for example the Reactor Pilot Program or the DOME test bed); Construction under review (construction, site or creation application filed); Design approved (design certification, standard design approval or GDA completed); Design review (formal design review under way, such as UK GDA, CNSC vendor design review or a French safety-options review); Pre-licensing (pre-application engagement only).
- Construction under review 1
- RegulatorsNational regulators the company has formally engaged (NRC, CNSC, ONR, ASN, and others), semicolon-separated.
- CNSC 1
- Licensing detailThe milestones behind the licensing stage, by regulator, with dates.
- Completed Phase 2 of the CNSC vendor design review with no fundamental barriers to licensing identified. NB Power applied for a licence to prepare site at Point Lepreau on 2023-06-30; a licence to construct application is planned by 2027. In July 2026 ARC signed a Strategic Partnership Project agreement with Battelle Energy Alliance (INL) covering design, demonstration and first deployment of the ARC-100. 1235
- Latest milestoneDate of the milestone that sets the licensing stage (for example the day a construction permit was issued or an application docketed).
- 2023-06-30 1
- First siteLocation of the first-of-a-kind commercial or demonstration unit, with the owner or host.
- Point Lepreau, New Brunswick (NB Power) 1
- First powerYear the company or its host utility targets for first operation (criticality or commercial operation, as stated) of the first unit. A plan, not a guarantee.
- Not published
- OwnershipPublic (listed shares), Private (venture or privately held), Subsidiary (a unit or joint venture of a larger company) or State-owned.
- Private 3
- TickerExchange and ticker of the company or its listed parent.
- Not published
- ListedFirst trading day of the company's shares (or its listed parent's current ticker) on the exchange named in Ticker.
- Not published
- FundingHeadline funding: equity raised, public listing, government cost-share awards (DOE ARDP, GAIN, Great British Nuclear and others), with amounts and dates.
- Not published
- Data-center dealTrue when the company has a signed, announced agreement (PPA, framework, MOU, investment or capacity reservation) with a hyperscaler or data-center operator.
- Not published
- Data-center partnersHyperscalers and data-center operators the company has a signed or announced agreement with, semicolon-separated.
- Not published
- Data-center dealsWhat each data-center or hyperscaler agreement covers: partner, type of agreement, capacity and date.
- Not published
- HQCountry of the company's headquarters.
- United States 4
- RegionHeadquarters region.
- North America 3
Sources
- CNSC: NB Power’s ARC-100 project accessed 2026-11-11
- WNN: ARC-100 completes Canadian design review accessed 2026-11-11
- Atlantica Energy: In conversation with ARC accessed 2026-11-11
- ARC Clean Technology: headquartered in the US, operations in Canada accessed 2026-11-11
- ANS: ARC signs INL Strategic Partnership Project agreement (July 2026) accessed 2026-11-11
Get a quote from ARC Clean Technology and similar companies
Tell us what you need once. We send it to matching companies and they reply to you directly.