Designs the ARC-100, a 100 MWe sodium-cooled fast reactor. NB Power plans the first unit at the Point Lepreau site in New Brunswick.

HQ US Sodium-cooled

Verified

Visit ARC Clean Technology Compare with others Request a quote

100 MWe↗Per module
Construction under reviewLicensing stage

Facts

Source per value
DesignThe company's lead reactor design name(s) as the company or its regulator names them; semicolon-separated when it markets more than one.
ARC-100 1
TypeReactor coolant/technology family. Gas-cooled fast is separated from thermal HTGR designs; sodium-cooled includes both fast and thermal-spectrum designs.
Sodium-cooled 2
Size classDerived from published electric output per module: Micro is 20 MWe or less, Small is above 20 and up to 300 MWe, Medium is above 300 MWe. Legacy heat-only classifications use one third of thermal output as an explicit comparison convention, not a claimed electric rating.
Small 2
MWe / module MWeNet (or gross where only gross is published) electric output of one reactor module as the company or its regulator publishes it. Null for heat-only designs.
100 2
MWt / module MWtThermal output of one reactor module as published by the company or its regulator.
Not published
FuelFuel form and enrichment class as published (for example LEU UO2, HALEU TRISO, fuel salt).
Not published
Licensing stageFurthest licensing milestone reached with any national regulator: Operating; Construction licensed (construction permit or licence issued); DOE test authorization (a test reactor authorized or built under the US Department of Energy, for example the Reactor Pilot Program or the DOME test bed); Construction under review (construction, site or creation application filed); Design approved (design certification, standard design approval or GDA completed); Design review (formal design review under way, such as UK GDA, CNSC vendor design review or a French safety-options review); Pre-licensing (pre-application engagement only).
Construction under review 1
RegulatorsNational regulators the company has formally engaged (NRC, CNSC, ONR, ASN, and others), semicolon-separated.
CNSC 1
Licensing detailThe milestones behind the licensing stage, by regulator, with dates.
Completed Phase 2 of the CNSC vendor design review with no fundamental barriers to licensing identified. NB Power applied for a licence to prepare site at Point Lepreau on 2023-06-30; a licence to construct application is planned by 2027. In July 2026 ARC signed a Strategic Partnership Project agreement with Battelle Energy Alliance (INL) covering design, demonstration and first deployment of the ARC-100. 1235
Latest milestoneDate of the milestone that sets the licensing stage (for example the day a construction permit was issued or an application docketed).
2023-06-30 1
First siteLocation of the first-of-a-kind commercial or demonstration unit, with the owner or host.
Point Lepreau, New Brunswick (NB Power) 1
First powerYear the company or its host utility targets for first operation (criticality or commercial operation, as stated) of the first unit. A plan, not a guarantee.
Not published
OwnershipPublic (listed shares), Private (venture or privately held), Subsidiary (a unit or joint venture of a larger company) or State-owned.
Private 3
TickerExchange and ticker of the company or its listed parent.
Not published
ListedFirst trading day of the company's shares (or its listed parent's current ticker) on the exchange named in Ticker.
Not published
FundingHeadline funding: equity raised, public listing, government cost-share awards (DOE ARDP, GAIN, Great British Nuclear and others), with amounts and dates.
Not published
Data-center dealTrue when the company has a signed, announced agreement (PPA, framework, MOU, investment or capacity reservation) with a hyperscaler or data-center operator.
Not published
Data-center partnersHyperscalers and data-center operators the company has a signed or announced agreement with, semicolon-separated.
Not published
Data-center dealsWhat each data-center or hyperscaler agreement covers: partner, type of agreement, capacity and date.
Not published
HQCountry of the company's headquarters.
United States 4
RegionHeadquarters region.
North America 3

Sources

  1. CNSC: NB Power’s ARC-100 project accessed 2026-11-11
  2. WNN: ARC-100 completes Canadian design review accessed 2026-11-11
  3. Atlantica Energy: In conversation with ARC accessed 2026-11-11
  4. ARC Clean Technology: headquartered in the US, operations in Canada accessed 2026-11-11
  5. ANS: ARC signs INL Strategic Partnership Project agreement (July 2026) accessed 2026-11-11

Get a quote from ARC Clean Technology and similar companies

Tell us what you need once. We send it to matching companies and they reply to you directly.

Quote requests open shortly. To get in first, email hello@smrcompanies.com.