Blue Capsule

Develops a sodium-cooled high-temperature reactor for industrial heat, steam and electricity. CEA describes 150 MWt of heat or 50 MWe of electricity; ASNR lists the industrial prototype in preparatory review.

Founded 2022 Sodium-cooled

Verified

Visit Blue Capsule Compare with others Request a quote

50 MWe↗Per module
150 MWt↗+Per module
2035↗First power target
Pre-licensingLicensing stage

Facts

Source per value
DesignThe company's lead reactor design name(s) as the company or its regulator names them; semicolon-separated when it markets more than one.
BLUE CAPSULE industrial prototype 1
TypeReactor coolant/technology family. Gas-cooled fast is separated from thermal HTGR designs; sodium-cooled includes both fast and thermal-spectrum designs.
Sodium-cooled 23
Size classDerived from published electric output per module: Micro is 20 MWe or less, Small is above 20 and up to 300 MWe, Medium is above 300 MWe. Legacy heat-only classifications use one third of thermal output as an explicit comparison convention, not a claimed electric rating.
Small 2
MWe / module MWeNet (or gross where only gross is published) electric output of one reactor module as the company or its regulator publishes it. Null for heat-only designs.
50 2
MWt / module MWtThermal output of one reactor module as published by the company or its regulator.
150 12
FuelFuel form and enrichment class as published (for example LEU UO2, HALEU TRISO, fuel salt).
TRISO 23
Licensing stageFurthest licensing milestone reached with any national regulator: Operating; Construction licensed (construction permit or licence issued); DOE test authorization (a test reactor authorized or built under the US Department of Energy, for example the Reactor Pilot Program or the DOME test bed); Construction under review (construction, site or creation application filed); Design approved (design certification, standard design approval or GDA completed); Design review (formal design review under way, such as UK GDA, CNSC vendor design review or a French safety-options review); Pre-licensing (pre-application engagement only).
Pre-licensing 1
RegulatorsNational regulators the company has formally engaged (NRC, CNSC, ONR, ASN, and others), semicolon-separated.
ASNR 1
Licensing detailThe milestones behind the licensing stage, by regulator, with dates.
ASNR lists Blue Capsule in project preparatory review in 2026, before the formal regulatory assessment phase. No construction licence is established by this listing. 1
Latest milestoneDate of the milestone that sets the licensing stage (for example the day a construction permit was issued or an application docketed).
Not published
First siteLocation of the first-of-a-kind commercial or demonstration unit, with the owner or host.
Not published
First powerYear the company or its host utility targets for first operation (criticality or commercial operation, as stated) of the first unit. A plan, not a guarantee.
2,035 2
OwnershipPublic (listed shares), Private (venture or privately held), Subsidiary (a unit or joint venture of a larger company) or State-owned.
Not published
TickerExchange and ticker of the company or its listed parent.
Not published
ListedFirst trading day of the company's shares (or its listed parent's current ticker) on the exchange named in Ticker.
Not published
FundingHeadline funding: equity raised, public listing, government cost-share awards (DOE ARDP, GAIN, Great British Nuclear and others), with amounts and dates.
Not published
Data-center dealTrue when the company has a signed, announced agreement (PPA, framework, MOU, investment or capacity reservation) with a hyperscaler or data-center operator.
Not published
Data-center partnersHyperscalers and data-center operators the company has a signed or announced agreement with, semicolon-separated.
Not published
Data-center dealsWhat each data-center or hyperscaler agreement covers: partner, type of agreement, capacity and date.
Not published
HQCountry of the company's headquarters.
Not published
RegionHeadquarters region.
Not published

Sources

  1. ASNR: Blue Capsule prototype and preparatory review status accessed 2026-11-11
  2. CEA: Blue Capsule specifications and first commissioning target accessed 2026-11-11
  3. Blue Capsule: sodium pool and TRISO fuel accessed 2026-11-11

Get a quote from Blue Capsule and similar companies

Tell us what you need once. We send it to matching companies and they reply to you directly.

Quote requests open shortly. To get in first, email hello@smrcompanies.com.