Hexana

CEA spin-off designing a plant of two 400 MWt sodium-cooled fast reactors coupled to thermal storage, for electricity and industrial heat.

HQ FR Sodium-cooled

Verified

Visit Hexana Compare with others Request a quote

400 MWt↗Per module
2035↗First power target
Design reviewLicensing stage

Facts

Source per value
DesignThe company's lead reactor design name(s) as the company or its regulator names them; semicolon-separated when it markets more than one.
Hexana (two-reactor SFR plant with thermal storage) 2
TypeReactor coolant/technology family. Gas-cooled fast is separated from thermal HTGR designs; sodium-cooled includes both fast and thermal-spectrum designs.
Sodium-cooled 1
Size classDerived from published electric output per module: Micro is 20 MWe or less, Small is above 20 and up to 300 MWe, Medium is above 300 MWe. Legacy heat-only classifications use one third of thermal output as an explicit comparison convention, not a claimed electric rating.
Not published
MWe / module MWeNet (or gross where only gross is published) electric output of one reactor module as the company or its regulator publishes it. Null for heat-only designs.
Not published
MWt / module MWtThermal output of one reactor module as published by the company or its regulator.
400 1
FuelFuel form and enrichment class as published (for example LEU UO2, HALEU TRISO, fuel salt).
Not published
Licensing stageFurthest licensing milestone reached with any national regulator: Operating; Construction licensed (construction permit or licence issued); DOE test authorization (a test reactor authorized or built under the US Department of Energy, for example the Reactor Pilot Program or the DOME test bed); Construction under review (construction, site or creation application filed); Design approved (design certification, standard design approval or GDA completed); Design review (formal design review under way, such as UK GDA, CNSC vendor design review or a French safety-options review); Pre-licensing (pre-application engagement only).
Design review 1
RegulatorsNational regulators the company has formally engaged (NRC, CNSC, ONR, ASN, and others), semicolon-separated.
ASNR 1
Licensing detailThe milestones behind the licensing stage, by regulator, with dates.
Requested an ASNR opinion on a first safety option on 2026-09-30. 1
Latest milestoneDate of the milestone that sets the licensing stage (for example the day a construction permit was issued or an application docketed).
2026-09-30 1
First siteLocation of the first-of-a-kind commercial or demonstration unit, with the owner or host.
Not published
First powerYear the company or its host utility targets for first operation (criticality or commercial operation, as stated) of the first unit. A plan, not a guarantee.
2,035 2
OwnershipPublic (listed shares), Private (venture or privately held), Subsidiary (a unit or joint venture of a larger company) or State-owned.
Private 3
TickerExchange and ticker of the company or its listed parent.
Not published
ListedFirst trading day of the company's shares (or its listed parent's current ticker) on the exchange named in Ticker.
Not published
FundingHeadline funding: equity raised, public listing, government cost-share awards (DOE ARDP, GAIN, Great British Nuclear and others), with amounts and dates.
€25 million (March 2025): €15 million equity plus a €10 million Bpifrance grant under France 2030. 3
Data-center dealTrue when the company has a signed, announced agreement (PPA, framework, MOU, investment or capacity reservation) with a hyperscaler or data-center operator.
Not published
Data-center partnersHyperscalers and data-center operators the company has a signed or announced agreement with, semicolon-separated.
Not published
Data-center dealsWhat each data-center or hyperscaler agreement covers: partner, type of agreement, capacity and date.
Not published
HQCountry of the company's headquarters.
France 2
RegionHeadquarters region.
Europe 2

Sources

  1. ASNR: SMR projects accessed 2026-11-11
  2. CEA: Hexana start-up accessed 2026-11-11
  3. Hexana secures €25m for SFR development accessed 2026-11-11

Get a quote from Hexana and similar companies

Tell us what you need once. We send it to matching companies and they reply to you directly.

Quote requests open shortly. To get in first, email hello@smrcompanies.com.