GE Vernova Hitachi Nuclear Energy

Designs the BWRX-300, a 300 MWe boiling-water SMR, and supplies it to utilities. The first unit is under construction at OPG’s Darlington site in Ontario, and TVA holds a US construction permit for Clinch River.

HQ US LWRData-center dealConstruction approved

Verified

Visit GE Vernova Hitachi Nuclear Energy Compare with others Request a quote

300 MWe↗Per module
Construction licensedLicensing stage

Facts

Source per value
DesignThe company's lead reactor design name(s) as the company or its regulator names them; semicolon-separated when it markets more than one.
BWRX-300 2
TypeReactor coolant/technology family. Gas-cooled fast is separated from thermal HTGR designs; sodium-cooled includes both fast and thermal-spectrum designs.
LWR 2
Size classDerived from published electric output per module: Micro is 20 MWe or less, Small is above 20 and up to 300 MWe, Medium is above 300 MWe. Legacy heat-only classifications use one third of thermal output as an explicit comparison convention, not a claimed electric rating.
Small 2
MWe / module MWeNet (or gross where only gross is published) electric output of one reactor module as the company or its regulator publishes it. Null for heat-only designs.
300 2
MWt / module MWtThermal output of one reactor module as published by the company or its regulator.
Not published
FuelFuel form and enrichment class as published (for example LEU UO2, HALEU TRISO, fuel salt).
Not published
Licensing stageFurthest licensing milestone reached with any national regulator: Operating; Construction licensed (construction permit or licence issued); DOE test authorization (a test reactor authorized or built under the US Department of Energy, for example the Reactor Pilot Program or the DOME test bed); Construction under review (construction, site or creation application filed); Design approved (design certification, standard design approval or GDA completed); Design review (formal design review under way, such as UK GDA, CNSC vendor design review or a French safety-options review); Pre-licensing (pre-application engagement only).
Construction licensed 2
RegulatorsNational regulators the company has formally engaged (NRC, CNSC, ONR, ASN, and others), semicolon-separated.
CNSC; NRC 23
Licensing detailThe milestones behind the licensing stage, by regulator, with dates.
CNSC issued OPG a licence to construct one BWRX-300 at Darlington on 2025-04-04. NRC issued TVA a construction permit for Clinch River Unit 1 on 2026-09-29, the first US permit for the design. OPG’s 2026-11-10 update says Unit 1 will miss its earlier October 2030 commercial-operation target; a replacement schedule is not yet published. 234
Latest milestoneDate of the milestone that sets the licensing stage (for example the day a construction permit was issued or an application docketed).
2026-09-29 2
First siteLocation of the first-of-a-kind commercial or demonstration unit, with the owner or host.
Darlington, Ontario (OPG): four units planned, Unit 1 under construction 34
First powerYear the company or its host utility targets for first operation (criticality or commercial operation, as stated) of the first unit. A plan, not a guarantee.
Not published
OwnershipPublic (listed shares), Private (venture or privately held), Subsidiary (a unit or joint venture of a larger company) or State-owned.
Subsidiary 1
TickerExchange and ticker of the company or its listed parent.
Not published
ListedFirst trading day of the company's shares (or its listed parent's current ticker) on the exchange named in Ticker.
Not published
FundingHeadline funding: equity raised, public listing, government cost-share awards (DOE ARDP, GAIN, Great British Nuclear and others), with amounts and dates.
US DOE awarded TVA $400 million on 2025-12-02 to accelerate the Clinch River BWRX-300. 1
Data-center dealTrue when the company has a signed, announced agreement (PPA, framework, MOU, investment or capacity reservation) with a hyperscaler or data-center operator.
Yes 5
Data-center partnersHyperscalers and data-center operators the company has a signed or announced agreement with, semicolon-separated.
Crusoe (via Blue Energy) 6
Data-center dealsWhat each data-center or hyperscaler agreement covers: partner, type of agreement, capacity and date.
Blue Energy signed a power agreement with Crusoe (November 2025) for an AI campus at Port of Victoria, Texas: gas power from 2028, nuclear by 2031. In August 2026 Blue Energy signed an engineering and licensing agreement with GE Vernova Hitachi for up to five BWRX-300s from 2032 to power a nearby data center. 56
HQCountry of the company's headquarters.
United States 1
RegionHeadquarters region.
North America 1

Sources

  1. GE Vernova: DOE $400M for first US SMR accessed 2026-11-11
  2. GE Vernova: Clinch River permit, 29 September 2026 accessed 2026-11-11
  3. CNSC: Darlington licence to construct; operating application under review accessed 2026-11-11
  4. OPG 10 November 2026 update: October 2030 target and original budget no longer expected accessed 2026-11-11
  5. GE Vernova: Blue Energy engineering agreement, five BWRX-300s from 2032 accessed 2026-11-11
  6. WNN: Crusoe named as Texas data-center partner accessed 2026-11-11

Get a quote from GE Vernova Hitachi Nuclear Energy and similar companies

Tell us what you need once. We send it to matching companies and they reply to you directly.

Quote requests open shortly. To get in first, email hello@smrcompanies.com.