NuScale Power
Designs the NuScale Power Module, a factory-built light-water SMR, and sells plants of up to 12 modules to utilities and industrial buyers. Its US460 design holds an NRC standard design approval.
Facts
Source per value- DesignThe company's lead reactor design name(s) as the company or its regulator names them; semicolon-separated when it markets more than one.
- NuScale US460 (NuScale Power Module) 1
- TypeReactor coolant/technology family. Gas-cooled fast is separated from thermal HTGR designs; sodium-cooled includes both fast and thermal-spectrum designs.
- LWR 1
- Size classDerived from published electric output per module: Micro is 20 MWe or less, Small is above 20 and up to 300 MWe, Medium is above 300 MWe. Legacy heat-only classifications use one third of thermal output as an explicit comparison convention, not a claimed electric rating.
- Small 1
- MWe / module MWeNet (or gross where only gross is published) electric output of one reactor module as the company or its regulator publishes it. Null for heat-only designs.
- 77 1
- MWt / module MWtThermal output of one reactor module as published by the company or its regulator.
- Not published
- FuelFuel form and enrichment class as published (for example LEU UO2, HALEU TRISO, fuel salt).
- Not published
- Licensing stageFurthest licensing milestone reached with any national regulator: Operating; Construction licensed (construction permit or licence issued); DOE test authorization (a test reactor authorized or built under the US Department of Energy, for example the Reactor Pilot Program or the DOME test bed); Construction under review (construction, site or creation application filed); Design approved (design certification, standard design approval or GDA completed); Design review (formal design review under way, such as UK GDA, CNSC vendor design review or a French safety-options review); Pre-licensing (pre-application engagement only).
- Design approved 14
- RegulatorsNational regulators the company has formally engaged (NRC, CNSC, ONR, ASN, and others), semicolon-separated.
- NRC 1
- Licensing detailThe milestones behind the licensing stage, by regulator, with dates.
- NRC issued the US460 standard design approval on 2025-05-29, two months ahead of schedule; the earlier US600 design was certified in 2023. 14
- Latest milestoneDate of the milestone that sets the licensing stage (for example the day a construction permit was issued or an application docketed).
- 2025-05-29 14
- First siteLocation of the first-of-a-kind commercial or demonstration unit, with the owner or host.
- TVA service territory via ENTRA1 Energy (up to 6 GW, six plants); RoPower Doicești, Romania (six 77 MWe modules, 462 MWe; FID approved February 2026, first module in commercial operation targeted for 2033) 235
- First powerYear the company or its host utility targets for first operation (criticality or commercial operation, as stated) of the first unit. A plan, not a guarantee.
- Not published
- OwnershipPublic (listed shares), Private (venture or privately held), Subsidiary (a unit or joint venture of a larger company) or State-owned.
- Public 3
- TickerExchange and ticker of the company or its listed parent.
- NYSE: SMR 3
- ListedFirst trading day of the company's shares (or its listed parent's current ticker) on the exchange named in Ticker.
- 2022-05-03 6
- FundingHeadline funding: equity raised, public listing, government cost-share awards (DOE ARDP, GAIN, Great British Nuclear and others), with amounts and dates.
- Listed on NYSE as SMR. ENTRA1, NuScale’s exclusive global partner, signed a non-binding 6 GW collaborative agreement with TVA on 2025-09-02. 2
- Data-center dealTrue when the company has a signed, announced agreement (PPA, framework, MOU, investment or capacity reservation) with a hyperscaler or data-center operator.
- Not published
- Data-center partnersHyperscalers and data-center operators the company has a signed or announced agreement with, semicolon-separated.
- Not published
- Data-center dealsWhat each data-center or hyperscaler agreement covers: partner, type of agreement, capacity and date.
- Not published
- HQCountry of the company's headquarters.
- United States 3
- RegionHeadquarters region.
- North America 3
Sources
- NRC 25-033: US460 approval, 29 May 2025; 77 MWe per module accessed 2026-11-11
- POWER: TVA, ENTRA1 sign 6 GW agreement accessed 2026-11-11
- NuScale Q4 2025 results accessed 2026-11-11
- NRC: NuScale US460 standard design approval accessed 2026-11-11
- WNN: Final investment decision for Romania’s SMRs (Feb 2026) accessed 2026-11-11
- NuScale 8-K: Class A stock began trading on NYSE as SMR on 3 May 2022 accessed 2026-11-11