newcleo

Develops lead-cooled fast reactors fuelled with MOX made from recycled plutonium, starting with the 30 MWe LFR-AS-30 and its MOX plant in France.

Lead-cooledData-center deal

Verified

Visit newcleo Compare with others Request a quote

90 MWt↗Per module
Design reviewLicensing stage

Facts

Source per value
DesignThe company's lead reactor design name(s) as the company or its regulator names them; semicolon-separated when it markets more than one.
LFR-AS-30; LFR-AS-200 1
TypeReactor coolant/technology family. Gas-cooled fast is separated from thermal HTGR designs; sodium-cooled includes both fast and thermal-spectrum designs.
Lead-cooled 1
Size classDerived from published electric output per module: Micro is 20 MWe or less, Small is above 20 and up to 300 MWe, Medium is above 300 MWe. Legacy heat-only classifications use one third of thermal output as an explicit comparison convention, not a claimed electric rating.
Not published
MWe / module MWeNet (or gross where only gross is published) electric output of one reactor module as the company or its regulator publishes it. Null for heat-only designs.
Not published
MWt / module MWtThermal output of one reactor module as published by the company or its regulator.
90 1
FuelFuel form and enrichment class as published (for example LEU UO2, HALEU TRISO, fuel salt).
MOX 2
Licensing stageFurthest licensing milestone reached with any national regulator: Operating; Construction licensed (construction permit or licence issued); DOE test authorization (a test reactor authorized or built under the US Department of Energy, for example the Reactor Pilot Program or the DOME test bed); Construction under review (construction, site or creation application filed); Design approved (design certification, standard design approval or GDA completed); Design review (formal design review under way, such as UK GDA, CNSC vendor design review or a French safety-options review); Pre-licensing (pre-application engagement only).
Design review 1
RegulatorsNational regulators the company has formally engaged (NRC, CNSC, ONR, ASN, and others), semicolon-separated.
ASNR 1
Licensing detailThe milestones behind the licensing stage, by regulator, with dates.
Requested an ASNR opinion on LFR-AS-30 safety options on 2025-12-19. Its pilot MOX-LFR fuel plant received an ASNR opinion in 2026. 1
Latest milestoneDate of the milestone that sets the licensing stage (for example the day a construction permit was issued or an application docketed).
2025-12-19 1
First siteLocation of the first-of-a-kind commercial or demonstration unit, with the owner or host.
Not published
First powerYear the company or its host utility targets for first operation (criticality or commercial operation, as stated) of the first unit. A plan, not a guarantee.
Not published
OwnershipPublic (listed shares), Private (venture or privately held), Subsidiary (a unit or joint venture of a larger company) or State-owned.
Private 2
TickerExchange and ticker of the company or its listed parent.
Not published
ListedFirst trading day of the company's shares (or its listed parent's current ticker) on the exchange named in Ticker.
Not published
FundingHeadline funding: equity raised, public listing, government cost-share awards (DOE ARDP, GAIN, Great British Nuclear and others), with amounts and dates.
$85 million round closed February 2026, more than $125 million in 12 months and over $755 million since 2021. 2
Data-center dealTrue when the company has a signed, announced agreement (PPA, framework, MOU, investment or capacity reservation) with a hyperscaler or data-center operator.
Yes 3
Data-center partnersHyperscalers and data-center operators the company has a signed or announced agreement with, semicolon-separated.
Evroc 3
Data-center dealsWhat each data-center or hyperscaler agreement covers: partner, type of agreement, capacity and date.
Non-binding MoU with Evroc and Studsvik to explore an SMR-powered data center at Nyköping, Sweden. 3
HQCountry of the company's headquarters.
Not published
RegionHeadquarters region.
Not published

Sources

  1. ASNR: SMR projects accessed 2026-11-11
  2. NucNet: newcleo closes $85M round accessed 2026-11-11
  3. DCD: newcleo coverage (Evroc, Studsvik MoU) accessed 2026-11-11

Get a quote from newcleo and similar companies

Tell us what you need once. We send it to matching companies and they reply to you directly.

Quote requests open shortly. To get in first, email hello@smrcompanies.com.