NANO Nuclear Energy

Listed microreactor developer whose KRONOS MMR is a 15 MWe high-temperature gas-cooled reactor. The first unit is planned on the University of Illinois Urbana-Champaign campus.

HQ US HTGRMicroreactorData-center dealListed

Verified

Visit NANO Nuclear Energy Compare with others Request a quote

15 MWe↗Per module
45 MWt↗Per module
Construction under reviewLicensing stage

Facts

Source per value
DesignThe company's lead reactor design name(s) as the company or its regulator names them; semicolon-separated when it markets more than one.
KRONOS MMR 1
TypeReactor coolant/technology family. Gas-cooled fast is separated from thermal HTGR designs; sodium-cooled includes both fast and thermal-spectrum designs.
HTGR 4
Size classDerived from published electric output per module: Micro is 20 MWe or less, Small is above 20 and up to 300 MWe, Medium is above 300 MWe. Legacy heat-only classifications use one third of thermal output as an explicit comparison convention, not a claimed electric rating.
Micro 4
MWe / module MWeNet (or gross where only gross is published) electric output of one reactor module as the company or its regulator publishes it. Null for heat-only designs.
15 4
MWt / module MWtThermal output of one reactor module as published by the company or its regulator.
45 1
FuelFuel form and enrichment class as published (for example LEU UO2, HALEU TRISO, fuel salt).
Not published
Licensing stageFurthest licensing milestone reached with any national regulator: Operating; Construction licensed (construction permit or licence issued); DOE test authorization (a test reactor authorized or built under the US Department of Energy, for example the Reactor Pilot Program or the DOME test bed); Construction under review (construction, site or creation application filed); Design approved (design certification, standard design approval or GDA completed); Design review (formal design review under way, such as UK GDA, CNSC vendor design review or a French safety-options review); Pre-licensing (pre-application engagement only).
Construction under review 1
RegulatorsNational regulators the company has formally engaged (NRC, CNSC, ONR, ASN, and others), semicolon-separated.
NRC 1
Licensing detailThe milestones behind the licensing stage, by regulator, with dates.
University of Illinois submitted the KRONOS construction permit application on 2026-03-31; NRC docketed it on 2026-05-18 and set the review schedule on 2026-06-16. 123
Latest milestoneDate of the milestone that sets the licensing stage (for example the day a construction permit was issued or an application docketed).
2026-05-18 3
First siteLocation of the first-of-a-kind commercial or demonstration unit, with the owner or host.
University of Illinois Urbana-Champaign campus 12
First powerYear the company or its host utility targets for first operation (criticality or commercial operation, as stated) of the first unit. A plan, not a guarantee.
Not published
OwnershipPublic (listed shares), Private (venture or privately held), Subsidiary (a unit or joint venture of a larger company) or State-owned.
Public 5
TickerExchange and ticker of the company or its listed parent.
NASDAQ: NNE 5
ListedFirst trading day of the company's shares (or its listed parent's current ticker) on the exchange named in Ticker.
2024-05-08 7
FundingHeadline funding: equity raised, public listing, government cost-share awards (DOE ARDP, GAIN, Great British Nuclear and others), with amounts and dates.
Not published
Data-center dealTrue when the company has a signed, announced agreement (PPA, framework, MOU, investment or capacity reservation) with a hyperscaler or data-center operator.
Yes 5
Data-center partnersHyperscalers and data-center operators the company has a signed or announced agreement with, semicolon-separated.
Tillman Digital Gateway; Supermicro 56
Data-center dealsWhat each data-center or hyperscaler agreement covers: partner, type of agreement, capacity and date.
Non-binding framework with Tillman Digital Gateway (2026-08-24) targeting 2 GW by the mid-2030s and 6 GW by 2040, with up to $100M in milestone warrants; MOU with Supermicro on on-site reactors for AI data centers (2026-05-06). 56
HQCountry of the company's headquarters.
United States 5
RegionHeadquarters region.
North America 5

Sources

  1. NRC: KRONOS project accessed 2026-11-11
  2. ANS: UIUC submits MMR construction permit application accessed 2026-11-11
  3. KRONOS MMR selected for full NRC review accessed 2026-11-11
  4. NANO Nuclear 15 MWe Gen IV microreactor accessed 2026-11-11
  5. Power Engineering: up to 6 GW for data centers accessed 2026-11-11
  6. NANO Nuclear: MOU with Supermicro accessed 2026-11-11
  7. NANO Nuclear: IPO pricing, Nasdaq trading from 8 May 2024 accessed 2026-11-11

Get a quote from NANO Nuclear Energy and similar companies

Tell us what you need once. We send it to matching companies and they reply to you directly.

Quote requests open shortly. To get in first, email hello@smrcompanies.com.