{
  "name": "SMR companies, licence by licence",
  "url": "https://smrcompanies.com/",
  "license": "CC BY 4.0",
  "cite": "SMR Companies, https://smrcompanies.com/",
  "updated": "2026-11-11",
  "fields": [
    {
      "key": "design",
      "label": "Design",
      "type": "string",
      "description": "The company's lead reactor design name(s) as the company or its regulator names them; semicolon-separated when it markets more than one.",
      "filterable": false,
      "sortable": true
    },
    {
      "key": "reactor_type",
      "label": "Type",
      "type": "enum",
      "description": "Reactor coolant/technology family. Gas-cooled fast is separated from thermal HTGR designs; sodium-cooled includes both fast and thermal-spectrum designs.",
      "filterable": true,
      "sortable": true,
      "enumValues": [
        "LWR",
        "HTGR",
        "Gas-cooled fast",
        "Sodium-cooled",
        "Lead-cooled",
        "Molten salt",
        "Heat pipe",
        "Other"
      ]
    },
    {
      "key": "size_class",
      "label": "Size class",
      "type": "enum",
      "description": "Derived from published electric output per module: Micro is 20 MWe or less, Small is above 20 and up to 300 MWe, Medium is above 300 MWe. Legacy heat-only classifications use one third of thermal output as an explicit comparison convention, not a claimed electric rating.",
      "filterable": true,
      "sortable": true,
      "enumValues": [
        "Micro",
        "Small",
        "Medium"
      ]
    },
    {
      "key": "mwe_per_module",
      "label": "MWe / module",
      "type": "number",
      "unit": "MWe",
      "description": "Net (or gross where only gross is published) electric output of one reactor module as the company or its regulator publishes it. Null for heat-only designs.",
      "filterable": true,
      "sortable": true
    },
    {
      "key": "mwt_per_module",
      "label": "MWt / module",
      "type": "number",
      "unit": "MWt",
      "description": "Thermal output of one reactor module as published by the company or its regulator.",
      "filterable": false,
      "sortable": true
    },
    {
      "key": "fuel",
      "label": "Fuel",
      "type": "string",
      "description": "Fuel form and enrichment class as published (for example LEU UO2, HALEU TRISO, fuel salt).",
      "filterable": false,
      "sortable": false
    },
    {
      "key": "licensing_stage",
      "label": "Licensing stage",
      "type": "enum",
      "description": "Furthest licensing milestone reached with any national regulator: Operating; Construction licensed (construction permit or licence issued); DOE test authorization (a test reactor authorized or built under the US Department of Energy, for example the Reactor Pilot Program or the DOME test bed); Construction under review (construction, site or creation application filed); Design approved (design certification, standard design approval or GDA completed); Design review (formal design review under way, such as UK GDA, CNSC vendor design review or a French safety-options review); Pre-licensing (pre-application engagement only).",
      "filterable": true,
      "sortable": true,
      "enumValues": [
        "Operating",
        "Construction licensed",
        "DOE test authorization",
        "Construction under review",
        "Design approved",
        "Design review",
        "Pre-licensing"
      ]
    },
    {
      "key": "regulators",
      "label": "Regulators",
      "type": "string",
      "description": "National regulators the company has formally engaged (NRC, CNSC, ONR, ASN, and others), semicolon-separated.",
      "filterable": false,
      "sortable": false
    },
    {
      "key": "licensing_detail",
      "label": "Licensing detail",
      "type": "string",
      "description": "The milestones behind the licensing stage, by regulator, with dates.",
      "filterable": false,
      "sortable": false
    },
    {
      "key": "licensing_date",
      "label": "Latest milestone",
      "type": "date",
      "description": "Date of the milestone that sets the licensing stage (for example the day a construction permit was issued or an application docketed).",
      "filterable": false,
      "sortable": true
    },
    {
      "key": "foak_site",
      "label": "First site",
      "type": "string",
      "description": "Location of the first-of-a-kind commercial or demonstration unit, with the owner or host.",
      "filterable": false,
      "sortable": false
    },
    {
      "key": "foak_year",
      "label": "First power",
      "type": "number",
      "description": "Year the company or its host utility targets for first operation (criticality or commercial operation, as stated) of the first unit. A plan, not a guarantee.",
      "filterable": true,
      "sortable": true
    },
    {
      "key": "ownership",
      "label": "Ownership",
      "type": "enum",
      "description": "Public (listed shares), Private (venture or privately held), Subsidiary (a unit or joint venture of a larger company) or State-owned.",
      "filterable": true,
      "sortable": true,
      "enumValues": [
        "Public",
        "Private",
        "Subsidiary",
        "State-owned"
      ]
    },
    {
      "key": "ticker",
      "label": "Ticker",
      "type": "string",
      "description": "Exchange and ticker of the company or its listed parent.",
      "filterable": false,
      "sortable": true
    },
    {
      "key": "listed",
      "label": "Listed",
      "type": "date",
      "description": "First trading day of the company's shares (or its listed parent's current ticker) on the exchange named in Ticker.",
      "filterable": false,
      "sortable": true
    },
    {
      "key": "funding",
      "label": "Funding",
      "type": "string",
      "description": "Headline funding: equity raised, public listing, government cost-share awards (DOE ARDP, GAIN, Great British Nuclear and others), with amounts and dates.",
      "filterable": false,
      "sortable": false
    },
    {
      "key": "dc_deal",
      "label": "Data-center deal",
      "type": "bool",
      "description": "True when the company has a signed, announced agreement (PPA, framework, MOU, investment or capacity reservation) with a hyperscaler or data-center operator.",
      "filterable": true,
      "sortable": true
    },
    {
      "key": "dc_partners",
      "label": "Data-center partners",
      "type": "string",
      "description": "Hyperscalers and data-center operators the company has a signed or announced agreement with, semicolon-separated.",
      "filterable": false,
      "sortable": true
    },
    {
      "key": "dc_deals",
      "label": "Data-center deals",
      "type": "string",
      "description": "What each data-center or hyperscaler agreement covers: partner, type of agreement, capacity and date.",
      "filterable": false,
      "sortable": false
    },
    {
      "key": "hq_country",
      "label": "HQ",
      "type": "string",
      "description": "Country of the company's headquarters.",
      "filterable": false,
      "sortable": true
    },
    {
      "key": "hq_region",
      "label": "Region",
      "type": "enum",
      "description": "Headquarters region.",
      "filterable": true,
      "sortable": true,
      "enumValues": [
        "North America",
        "Europe",
        "Asia"
      ]
    }
  ],
  "records": [
    {
      "id": "aalo-atomics",
      "name": "Aalo Atomics",
      "url": "https://www.aalo.com/",
      "summary": "Builds the Aalo-1, a 10 MWe sodium-cooled reactor, and the Aalo Pod, five of them in a 50 MWe plant aimed at data centers. Its test reactor went critical at Idaho National Laboratory on 4 July 2026.",
      "hq": "US",
      "tags": [
        "Sodium-cooled",
        "Microreactor"
      ],
      "fields": {
        "design": "Aalo-X; Aalo-1; Aalo Pod",
        "reactor_type": "Sodium-cooled",
        "size_class": "Micro",
        "mwe_per_module": 10,
        "mwt_per_module": null,
        "fuel": null,
        "licensing_stage": "DOE test authorization",
        "regulators": "DOE",
        "licensing_detail": "Aalo-X critical test reactor reached zero-power criticality at Idaho National Laboratory on 2026-07-04 under the DOE Reactor Pilot Program, the fourth to do so. Grid or data-center sales still need NRC approval.",
        "licensing_date": "2026-07-04",
        "foak_site": "Idaho National Laboratory (Aalo-X, with a co-located experimental data center planned)",
        "foak_year": 2028,
        "ownership": "Private",
        "ticker": null,
        "funding": null,
        "dc_deal": null,
        "dc_partners": null,
        "dc_deals": null,
        "hq_country": "United States",
        "hq_region": "North America",
        "listed": null
      },
      "sources": [
        {
          "url": "https://www.energy.gov/articles/department-energy-celebrates-fourth-criticality-ahead-july-4th-goal",
          "title": "DOE: fourth criticality ahead of July 4",
          "accessed": "2026-11-11",
          "fields": [
            "design",
            "licensing_date",
            "licensing_detail",
            "licensing_stage",
            "regulators"
          ]
        },
        {
          "url": "https://www.powermag.com/aalo-atomics-test-reactor-reaches-criticality-at-inl-fourth-doe-authorized-advanced-reactor-by-july-4/",
          "title": "POWER: Aalo test reactor reaches criticality",
          "accessed": "2026-11-11",
          "fields": [
            "foak_site",
            "hq_country",
            "hq_region",
            "licensing_detail",
            "ownership",
            "reactor_type"
          ]
        },
        {
          "url": "https://world-nuclear-news.org/articles/aalo-reveals-microreactor-solution-for-data-centres",
          "title": "WNN: Aalo unveils microreactor option for data centres",
          "accessed": "2026-11-11",
          "fields": [
            "design",
            "foak_site",
            "mwe_per_module",
            "size_class"
          ]
        },
        {
          "url": "https://www.aalo.com/post/announcing-the-aalo-pod",
          "title": "Aalo: announcing the Aalo Pod",
          "accessed": "2026-11-11",
          "fields": [
            "design",
            "foak_year"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "antares",
      "name": "Antares Nuclear",
      "url": "https://antaresindustries.com/",
      "summary": "Builds sodium heat-pipe microreactors for military bases, space and remote grids. Its Mark-0 was the first reactor to go critical under the DOE Reactor Pilot Program.",
      "hq": "US",
      "tags": [
        "Heat pipe",
        "Microreactor"
      ],
      "fields": {
        "design": "Mark-0 (test); R1",
        "reactor_type": "Heat pipe",
        "size_class": "Micro",
        "mwe_per_module": null,
        "mwt_per_module": null,
        "fuel": "HALEU TRISO",
        "licensing_stage": "DOE test authorization",
        "regulators": "DOE",
        "licensing_detail": "Mark-0 reached zero-power criticality at Idaho National Laboratory on 2026-06-04, the first fueled criticality under the DOE Reactor Pilot Program.",
        "licensing_date": "2026-06-04",
        "foak_site": "Idaho National Laboratory (Mark-0); military installations from 2028",
        "foak_year": 2027,
        "ownership": "Private",
        "ticker": null,
        "funding": "$96 million Series B (December 2025); raised a further $470 million in 2026 to build reactors for military bases.",
        "dc_deal": null,
        "dc_partners": null,
        "dc_deals": null,
        "hq_country": "United States",
        "hq_region": "North America",
        "listed": null
      },
      "sources": [
        {
          "url": "https://www.energy.gov/node/4858894",
          "title": "DOE: first advanced reactor criticality",
          "accessed": "2026-11-11",
          "fields": [
            "design",
            "foak_site",
            "hq_country",
            "hq_region",
            "licensing_date",
            "licensing_detail",
            "licensing_stage",
            "regulators"
          ]
        },
        {
          "url": "https://www.army.mil/article-amp/293057/antares_nuclears_successful_zero_power_criticality_test_marks_major_step_for_military_applications_of_advanced_microreactors",
          "title": "US Army: Antares zero-power criticality",
          "accessed": "2026-11-11",
          "fields": [
            "foak_site",
            "fuel",
            "reactor_type",
            "size_class"
          ]
        },
        {
          "url": "https://www.mobilityengineeringtech.com/component/content/article/55362-antares-achieves-initial-criticality-of-mark-0-nuclear-microreactor",
          "title": "Antares achieves initial criticality of Mark-0",
          "accessed": "2026-11-11",
          "fields": [
            "design",
            "foak_year",
            "funding",
            "ownership"
          ]
        },
        {
          "url": "https://www.nucnet.org/news/us-startup-raises-usd470-million-to-build-reactors-for-military-bases-7-2-2026",
          "title": "NucNet: Antares raises $470 million",
          "accessed": "2026-11-11",
          "fields": [
            "funding"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "arc-clean-technology",
      "name": "ARC Clean Technology",
      "url": "https://www.arc-cleantech.com/",
      "summary": "Designs the ARC-100, a 100 MWe sodium-cooled fast reactor. NB Power plans the first unit at the Point Lepreau site in New Brunswick.",
      "hq": "US",
      "tags": [
        "Sodium-cooled"
      ],
      "fields": {
        "design": "ARC-100",
        "reactor_type": "Sodium-cooled",
        "size_class": "Small",
        "mwe_per_module": 100,
        "mwt_per_module": null,
        "fuel": null,
        "licensing_stage": "Construction under review",
        "regulators": "CNSC",
        "licensing_detail": "Completed Phase 2 of the CNSC vendor design review with no fundamental barriers to licensing identified. NB Power applied for a licence to prepare site at Point Lepreau on 2023-06-30; a licence to construct application is planned by 2027. In July 2026 ARC signed a Strategic Partnership Project agreement with Battelle Energy Alliance (INL) covering design, demonstration and first deployment of the ARC-100.",
        "licensing_date": "2023-06-30",
        "foak_site": "Point Lepreau, New Brunswick (NB Power)",
        "foak_year": null,
        "ownership": "Private",
        "ticker": null,
        "funding": null,
        "dc_deal": null,
        "dc_partners": null,
        "dc_deals": null,
        "hq_country": "United States",
        "hq_region": "North America",
        "listed": null
      },
      "sources": [
        {
          "url": "https://www.cnsc-ccsn.gc.ca/eng/reactors/new-reactor-power-plant-projects/new-reactor-power-plant-facilities/nbpower/",
          "title": "CNSC: NB Power’s ARC-100 project",
          "accessed": "2026-11-11",
          "fields": [
            "design",
            "foak_site",
            "licensing_date",
            "licensing_detail",
            "licensing_stage",
            "regulators"
          ]
        },
        {
          "url": "https://wnn.world-nuclear.org/articles/arc-100-completes-canadian-regulatory-design-review",
          "title": "WNN: ARC-100 completes Canadian design review",
          "accessed": "2026-11-11",
          "fields": [
            "licensing_detail",
            "mwe_per_module",
            "reactor_type",
            "size_class"
          ]
        },
        {
          "url": "https://www.atlanticaenergy.org/arc-clean-technology-member-spotlight/",
          "title": "Atlantica Energy: In conversation with ARC",
          "accessed": "2026-11-11",
          "fields": [
            "hq_region",
            "licensing_detail",
            "ownership"
          ]
        },
        {
          "url": "https://www.arc-cleantech.com/",
          "title": "ARC Clean Technology: headquartered in the US, operations in Canada",
          "accessed": "2026-11-11",
          "fields": [
            "hq_country"
          ]
        },
        {
          "url": "https://www.ans.org/news/article-8260/",
          "title": "ANS: ARC signs INL Strategic Partnership Project agreement (July 2026)",
          "accessed": "2026-11-11",
          "fields": [
            "licensing_detail"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "blue-capsule",
      "name": "Blue Capsule",
      "url": "https://www.bluecapsule-technology.com/",
      "summary": "Develops a sodium-cooled high-temperature reactor for industrial heat, steam and electricity. CEA describes 150 MWt of heat or 50 MWe of electricity; ASNR lists the industrial prototype in preparatory review.",
      "founded": 2022,
      "tags": [
        "Sodium-cooled"
      ],
      "fields": {
        "design": "BLUE CAPSULE industrial prototype",
        "reactor_type": "Sodium-cooled",
        "size_class": "Small",
        "mwe_per_module": 50,
        "mwt_per_module": 150,
        "fuel": "TRISO",
        "licensing_stage": "Pre-licensing",
        "regulators": "ASNR",
        "licensing_detail": "ASNR lists Blue Capsule in project preparatory review in 2026, before the formal regulatory assessment phase. No construction licence is established by this listing.",
        "licensing_date": null,
        "foak_site": null,
        "foak_year": 2035,
        "ownership": null,
        "ticker": null,
        "funding": null,
        "dc_deal": null,
        "dc_partners": null,
        "dc_deals": null,
        "hq_country": null,
        "hq_region": null,
        "listed": null
      },
      "sources": [
        {
          "url": "https://regulation-oversight.asnr.fr/oversight/small-modular-reactors/smr-projects-and-their-fuel-manufacturing-and-assembly-plants",
          "title": "ASNR: Blue Capsule prototype and preparatory review status",
          "accessed": "2026-11-11",
          "fields": [
            "design",
            "mwt_per_module",
            "regulators",
            "licensing_stage",
            "licensing_detail"
          ]
        },
        {
          "url": "https://www.cea.fr/english/Pages/innovation/start-ups/blue-capsule.aspx",
          "title": "CEA: Blue Capsule specifications and first commissioning target",
          "accessed": "2026-11-11",
          "fields": [
            "mwe_per_module",
            "mwt_per_module",
            "reactor_type",
            "size_class",
            "fuel",
            "foak_year"
          ]
        },
        {
          "url": "https://www.bluecapsule-technology.com/technology",
          "title": "Blue Capsule: sodium pool and TRISO fuel",
          "accessed": "2026-11-11",
          "fields": [
            "reactor_type",
            "fuel"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "blykalla",
      "name": "Blykalla",
      "url": "https://www.blykalla.com/",
      "summary": "Swedish developer of SEALER-55, a 55 MWe lead-cooled reactor, with reactor parks of six to eight units under application in Sweden.",
      "hq": "SE",
      "tags": [
        "Lead-cooled"
      ],
      "fields": {
        "design": "SEALER-55; SEALER-One prototype",
        "reactor_type": "Lead-cooled",
        "size_class": "Small",
        "mwe_per_module": 55,
        "mwt_per_module": null,
        "fuel": null,
        "licensing_stage": "Construction under review",
        "regulators": "SSM; Swedish Government",
        "licensing_detail": "Applied to the Swedish Government in May 2026 for a reactor park at Norrsundet (Gävle) and in August 2026 for a second park of up to 440 MW at Untra (Tierp). SSM review follows government approval.",
        "licensing_date": null,
        "foak_site": "Oskarshamn: non-nuclear electric pilot facility with Uniper (ground broken February 2025)",
        "foak_year": null,
        "ownership": "Private",
        "ticker": null,
        "funding": "About $50 million co-led by Oklo, Norrsken Launcher and Armada (December 2025); €15 million EIC equity and €2.5 million grant (February 2025).",
        "dc_deal": null,
        "dc_partners": null,
        "dc_deals": null,
        "hq_country": "Sweden",
        "hq_region": "Europe",
        "listed": null
      },
      "sources": [
        {
          "url": "https://www.blykalla.com/post/blykalla-raises-50m-to-accelerate-industrialization-of-its-lead-cooled-advanced-reactor-the-sealer",
          "title": "Blykalla raises $50M",
          "accessed": "2026-11-11",
          "fields": [
            "design",
            "foak_site",
            "funding",
            "hq_country",
            "hq_region",
            "ownership",
            "reactor_type"
          ]
        },
        {
          "url": "https://mynewsdesk.com/blykalla/pressreleases/blykalla-submits-application-for-second-advanced-nuclear-reactor-park-in-sweden-with-up-to-440-mw-of-capacity-3462329",
          "title": "Blykalla: second reactor park application",
          "accessed": "2026-11-11",
          "fields": [
            "licensing_detail",
            "licensing_stage",
            "mwe_per_module",
            "regulators",
            "size_class"
          ]
        },
        {
          "url": "https://smr.nucnet.org/news/blykalla-gets-eur15-million-european-investment-for-sealer-reactor-project-2-2-2025",
          "title": "NucNet: €15M European investment",
          "accessed": "2026-11-11",
          "fields": [
            "funding"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "bwxt",
      "name": "BWX Technologies",
      "url": "https://www.bwxt.com/",
      "summary": "Naval reactor and nuclear fuel manufacturer building Project Pele, a 1.5 MWe transportable gas-cooled microreactor for the US Department of Defense, and the civil BANR microreactor.",
      "hq": "US",
      "tags": [
        "HTGR",
        "Microreactor",
        "Listed"
      ],
      "fields": {
        "design": "Project Pele; BANR",
        "reactor_type": "HTGR",
        "size_class": "Micro",
        "mwe_per_module": 1.5,
        "mwt_per_module": null,
        "fuel": "TRISO",
        "licensing_stage": null,
        "regulators": null,
        "licensing_detail": null,
        "licensing_date": null,
        "foak_site": "Project Pele: built in Lynchburg, Virginia, tested at Idaho National Laboratory",
        "foak_year": 2028,
        "ownership": "Public",
        "ticker": "NYSE: BWXT",
        "funding": "DoD Strategic Capabilities Office selected BWXT to build Project Pele (June 2022); BANR supported by the DOE Advanced Reactor Demonstration Program.",
        "dc_deal": null,
        "dc_partners": null,
        "dc_deals": null,
        "hq_country": "United States",
        "hq_region": "North America",
        "listed": "2015-07-01"
      },
      "sources": [
        {
          "url": "https://www.powermag.com/project-pele-dods-htgr-mobile-nuclear-microreactor-breaks-ground",
          "title": "POWER: Project Pele breaks ground",
          "accessed": "2026-11-11",
          "fields": [
            "design",
            "mwe_per_module",
            "reactor_type",
            "size_class"
          ]
        },
        {
          "url": "https://www.businesswire.com/news/home/20220609005154/en/BWXT-to-Build-First-Advanced-Microreactor-in-United-States",
          "title": "BWXT to build first advanced microreactor in US",
          "accessed": "2026-11-11",
          "fields": [
            "funding"
          ]
        },
        {
          "url": "https://axios.com/2026/09/30/bwxt-project-pele-lynchburg-nuclear-janus",
          "title": "Axios: Project Pele schedule",
          "accessed": "2026-11-11",
          "fields": [
            "foak_site",
            "foak_year"
          ]
        },
        {
          "url": "https://www.businesswire.com/news/home/20251202414735/en/BWXT-Delivers-Full-Core-of-TRISO-Nuclear-Fuel-for-Project-Pele-Microreactor",
          "title": "BWXT: full TRISO core delivered for Pele",
          "accessed": "2026-11-11",
          "fields": [
            "fuel",
            "hq_country",
            "hq_region",
            "ownership",
            "ticker"
          ]
        },
        {
          "url": "https://bwxt.com/news/2015/06/30/BWXT-Completes-Spin-Off-of-Power-Generation-Business",
          "title": "BWXT: spin-off complete, BWXT trades on NYSE",
          "accessed": "2026-11-11",
          "fields": [
            "listed"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "calogena",
      "name": "Calogena",
      "url": "https://www.calogena.com/",
      "summary": "French start-up designing the CAL30, a 30 MW thermal water-cooled reactor that supplies city district-heating networks with heat only.",
      "hq": "FR",
      "tags": [
        "LWR",
        "Microreactor"
      ],
      "fields": {
        "design": "CAL30",
        "reactor_type": "LWR",
        "size_class": "Micro",
        "mwe_per_module": null,
        "mwt_per_module": 30,
        "fuel": null,
        "licensing_stage": "Design review",
        "regulators": "ASNR",
        "licensing_detail": "Request for an ASNR opinion filed 2024-10-31 (amended 2025-06-20); ASNR issued opinion 2026-AV-027 on 2026-05-19; further requests filed through 2026-08-28.",
        "licensing_date": "2026-05-19",
        "foak_site": "Pierrelatte, France (first commercial reactor)",
        "foak_year": 2032,
        "ownership": "Private",
        "ticker": null,
        "funding": "More than €50 million under France 2030; €40 million EU Innovation Fund grant for the first commercial reactor.",
        "dc_deal": null,
        "dc_partners": null,
        "dc_deals": null,
        "hq_country": "France",
        "hq_region": "Europe",
        "listed": null
      },
      "sources": [
        {
          "url": "https://regulation-oversight.asnr.fr/oversight/small-modular-reactors/smr-projects",
          "title": "ASNR: SMR projects",
          "accessed": "2026-11-11",
          "fields": [
            "design",
            "hq_country",
            "hq_region",
            "licensing_date",
            "licensing_detail",
            "licensing_stage",
            "mwt_per_module",
            "reactor_type",
            "regulators",
            "size_class"
          ]
        },
        {
          "url": "https://world-nuclear-news.org/articles/calogena-awarded-eu-funding-for-smr-deployment",
          "title": "WNN: Calogena awarded EU funding",
          "accessed": "2026-11-11",
          "fields": [
            "foak_site",
            "foak_year",
            "funding",
            "ownership"
          ]
        },
        {
          "url": "https://www.startupresearcher.com/news/calogena-secures-40-million-eu-grant-for-district-heating-smr",
          "title": "Calogena secures €40 million EU grant",
          "accessed": "2026-11-11",
          "fields": [
            "funding"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "china-huaneng",
      "name": "China Huaneng (HTR-PM)",
      "url": "https://www.chng.com.cn/",
      "summary": "State utility that leads and operates the HTR-PM at Shidaowan, the first commercial high-temperature gas-cooled modular plant: two pebble-bed reactors driving one 210 MWe turbine.",
      "hq": "CN",
      "tags": [
        "HTGR",
        "Construction approved"
      ],
      "fields": {
        "design": "HTR-PM (two reactors, one 210 MWe turbine)",
        "reactor_type": "HTGR",
        "size_class": "Small",
        "mwe_per_module": 105,
        "mwt_per_module": 250,
        "fuel": null,
        "licensing_stage": "Operating",
        "regulators": "NNSA (China)",
        "licensing_detail": "Construction began December 2012; both reactors critical in 2021 and at full power in December 2022; commercial operation from 2023-12-06. Heat supply added March 2024.",
        "licensing_date": "2023-12-06",
        "foak_site": "Shidaowan (Shidao Bay), Shandong",
        "foak_year": 2023,
        "ownership": "State-owned",
        "ticker": null,
        "funding": "Owned by China Huaneng (47.5%), China Nuclear Engineering Corporation (32.5%) and Tsinghua University’s INET (20%).",
        "dc_deal": null,
        "dc_partners": null,
        "dc_deals": null,
        "hq_country": "China",
        "hq_region": "Asia",
        "listed": null
      },
      "sources": [
        {
          "url": "https://www.powermag.com/impressive-milestones-achieved-on-chinese-advanced-nuclear-power-projects/",
          "title": "POWER: Chinese advanced nuclear milestones",
          "accessed": "2026-11-11",
          "fields": [
            "design",
            "funding",
            "hq_country",
            "hq_region",
            "mwe_per_module",
            "mwt_per_module",
            "ownership",
            "reactor_type",
            "size_class"
          ]
        },
        {
          "url": "https://www.neimagazine.com/news/chinas-htr-pm-demonstration-project-enters-commercial-operation-11354820/",
          "title": "NEI: HTR-PM enters commercial operation",
          "accessed": "2026-11-11",
          "fields": [
            "foak_site",
            "foak_year",
            "licensing_date",
            "licensing_detail",
            "licensing_stage",
            "regulators"
          ]
        },
        {
          "url": "https://wnn.world-nuclear.org/articles/htr-pm-heating-project-commissioned",
          "title": "WNN: HTR-PM heating project commissioned",
          "accessed": "2026-11-11",
          "fields": [
            "licensing_detail"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "cnnc",
      "name": "CNNC (China National Nuclear Corporation)",
      "url": "https://en.cnnc.com.cn/",
      "summary": "China’s state nuclear group behind the ACP100 Linglong One at Changjiang, Hainan. The integral PWR is under commissioning; IAEA PRIS reports 100 MWe net and 125 MWe gross, with no first-grid-connection date.",
      "hq": "CN",
      "tags": [
        "LWR",
        "Construction approved"
      ],
      "fields": {
        "design": "ACP100 (Linglong One)",
        "reactor_type": "LWR",
        "size_class": "Small",
        "mwe_per_module": 100,
        "mwt_per_module": 385,
        "fuel": null,
        "licensing_stage": "Construction licensed",
        "regulators": "NNSA (China)",
        "licensing_detail": "NNSA construction licence No. 2117 was issued on 2021-07-01; construction began 2021-07-13. IAEA PRIS lists the unit as under construction and its first-grid-connection date is null. October 2026 reporting targets fuel loading and grid connection by year-end; no achieved grid date is verified. PRIS gives 100 MWe net and 125 MWe gross.",
        "licensing_date": "2021-07-01",
        "foak_site": "Changjiang nuclear power plant, Hainan",
        "foak_year": null,
        "ownership": "State-owned",
        "ticker": null,
        "funding": null,
        "dc_deal": null,
        "dc_partners": null,
        "dc_deals": null,
        "hq_country": "China",
        "hq_region": "Asia",
        "listed": null
      },
      "sources": [
        {
          "url": "https://www.mee.gov.cn/xxgk2018/xxgk/xxgk09/202107/W020210709416557844152.pdf",
          "title": "NNSA: construction licence No. 2117, dated 1 July 2021",
          "accessed": "2026-11-11",
          "fields": [
            "licensing_date",
            "licensing_stage",
            "regulators",
            "foak_site"
          ]
        },
        {
          "url": "https://world-nuclear.org/information-library/country-profiles/countries-a-f/china-nuclear-power",
          "title": "WNA: Nuclear power in China",
          "accessed": "2026-11-11",
          "fields": [
            "hq_country",
            "hq_region",
            "licensing_date",
            "licensing_stage",
            "mwe_per_module",
            "mwt_per_module",
            "ownership",
            "regulators"
          ]
        },
        {
          "url": "https://pris-stats.iaea.org/reactor/reactors-by-code/CN",
          "title": "IAEA PRIS: LINGLONG-1, under construction; gridDate null",
          "accessed": "2026-11-11",
          "fields": [
            "design",
            "foak_site",
            "mwe_per_module",
            "mwt_per_module",
            "reactor_type",
            "size_class",
            "licensing_detail"
          ]
        },
        {
          "url": "https://www.nucnet.org/news/hot-testing-begins-at-china-s-linglong-1-small-modular-reactor-10-3-2026",
          "title": "NucNet: hot testing; fuel loading and grid connection remain 2026 targets",
          "accessed": "2026-11-11",
          "fields": [
            "licensing_detail"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "copenhagen-atomics",
      "name": "Copenhagen Atomics",
      "url": "https://www.copenhagenatomics.com/",
      "summary": "Danish developer of a containerised thorium molten salt reactor, 100 MWt and 42 MWe per unit, sold for $50 million upfront plus an annual fee.",
      "hq": "DK",
      "tags": [
        "Molten salt"
      ],
      "fields": {
        "design": "Copenhagen Atomics thorium MSR (Onion Core)",
        "reactor_type": "Molten salt",
        "size_class": "Small",
        "mwe_per_module": 42,
        "mwt_per_module": 100,
        "fuel": "Thorium fuel salt",
        "licensing_stage": null,
        "regulators": null,
        "licensing_detail": null,
        "licensing_date": null,
        "foak_site": "Paul Scherrer Institute, Switzerland: 1 MWt critical experiment",
        "foak_year": 2028,
        "ownership": "Private",
        "ticker": null,
        "funding": "More than 200 investors from 20 countries; commercial units priced at $50 million upfront plus $2 million a year.",
        "dc_deal": null,
        "dc_partners": null,
        "dc_deals": null,
        "hq_country": "Denmark",
        "hq_region": "Europe",
        "listed": null
      },
      "sources": [
        {
          "url": "https://www.copenhagenatomics.com/",
          "title": "Copenhagen Atomics",
          "accessed": "2026-11-11",
          "fields": [
            "design",
            "foak_year",
            "fuel",
            "funding",
            "hq_country",
            "hq_region",
            "mwe_per_module",
            "mwt_per_module",
            "ownership",
            "reactor_type",
            "size_class"
          ]
        },
        {
          "url": "https://www.psi.ch/en/news/media-releases/cooperation-in-reactor-research",
          "title": "PSI: cooperation in reactor research",
          "accessed": "2026-11-11",
          "fields": [
            "design",
            "foak_site"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "deep-fission",
      "name": "Deep Fission",
      "url": "https://www.deepfission.com/",
      "summary": "Designs the Gravity reactor, a 15 MWe pressurized-water reactor placed about a mile down a borehole so the rock does the job of a containment building. It targets data centers.",
      "hq": "US",
      "tags": [
        "LWR",
        "Microreactor",
        "Data-center deal"
      ],
      "fields": {
        "design": "Deep Fission Gravity reactor (borehole PWR)",
        "reactor_type": "LWR",
        "size_class": "Micro",
        "mwe_per_module": 15,
        "mwt_per_module": null,
        "fuel": "LEU",
        "licensing_stage": "Pre-licensing",
        "regulators": "NRC; DOE",
        "licensing_detail": "Deep Fission’s Parsons project page reports a completed 6,000 ft data-acquisition well and NRC pre-application engagement. It targets a DOE pilot in 2027 and lists DOE authorization to construct and operate the pilot as the next step.",
        "licensing_date": null,
        "foak_site": "Great Plains Industrial Park, Parsons, Kansas",
        "foak_year": 2027,
        "ownership": "Public",
        "ticker": "NASDAQ: FISN",
        "funding": "Nasdaq trading began 2026-06-18 under FISN; offering closed 2026-06-22 at $16 per share, raising $40 million gross.",
        "dc_deal": true,
        "dc_partners": "Endeavour (Edged)",
        "dc_deals": "Non-binding strategic partnership term sheet with Endeavour (2025-01-07) to co-develop 2 GW of nuclear capacity for Edged data centers; first reactors targeted for 2029.",
        "hq_country": "United States",
        "hq_region": "North America",
        "listed": "2026-06-18"
      },
      "sources": [
        {
          "url": "https://www.deepfission.com/sites/parsons",
          "title": "Deep Fission: Parsons project phases, 2027 DOE pilot target; authorization remains a next step",
          "accessed": "2026-11-11",
          "fields": [
            "licensing_stage",
            "regulators",
            "foak_year",
            "licensing_detail",
            "foak_site"
          ]
        },
        {
          "url": "https://www.deepfission.com/investors/sec-filings/all-sec-filings/content/0001104659-25-117373/tmb-20250930xs1a.htm",
          "title": "Deep Fission S-1/A: Gravity reactor specifications",
          "accessed": "2026-11-11",
          "fields": [
            "design",
            "mwe_per_module",
            "reactor_type",
            "size_class",
            "fuel"
          ]
        },
        {
          "url": "https://www.deepfission.com/newsroom/press-releases/detail/111/advanced-nuclear-company-deep-fission-announces-closing-of-public-offering-of-common-stock",
          "title": "Deep Fission: offering closed and Nasdaq trading commenced",
          "accessed": "2026-11-11",
          "fields": [
            "funding",
            "ownership",
            "ticker",
            "listed"
          ]
        },
        {
          "url": "https://www.deepfission.com/newsroom/press-releases/detail/94/deep-fission-and-endeavour-partner-to-speed-delivery-of-low-cost-nuclear-power-for-hyperscalers-targeting-5-7-cents-per-kwh",
          "title": "Deep Fission: Endeavour co-development agreement",
          "accessed": "2026-11-11",
          "fields": [
            "dc_deal",
            "dc_deals",
            "dc_partners",
            "hq_country",
            "hq_region"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "fleet-nuclear",
      "name": "Fleet Nuclear (formerly ThorCon)",
      "url": "https://fleetnuclear.com/",
      "summary": "Develops shipyard-built, liquid-fuelled molten salt power plants. The current F500 specification is a 500 MWe plant with four reactor cans; plant output is not entered as output per reactor.",
      "tags": [
        "Molten salt"
      ],
      "fields": {
        "design": "F500 (four-reactor plant)",
        "reactor_type": "Molten salt",
        "size_class": null,
        "mwe_per_module": null,
        "mwt_per_module": null,
        "fuel": "Low-enriched uranium dissolved in molten salt",
        "licensing_stage": null,
        "regulators": null,
        "licensing_detail": "Company plans DOE authorization for its first demonstration, followed by NRC Part 53 licensing. This states a proposed pathway, not an authorization already granted.",
        "licensing_date": null,
        "foak_site": null,
        "foak_year": null,
        "ownership": null,
        "ticker": null,
        "funding": null,
        "dc_deal": null,
        "dc_partners": null,
        "dc_deals": null,
        "hq_country": null,
        "hq_region": null,
        "listed": null
      },
      "sources": [
        {
          "url": "https://fleetnuclear.com/technology",
          "title": "Fleet Nuclear: F500 plant configuration, fuel and planned licensing pathway",
          "accessed": "2026-11-11",
          "fields": [
            "design",
            "reactor_type",
            "fuel",
            "licensing_detail"
          ]
        },
        {
          "url": "https://thorconpower.com/",
          "title": "ThorCon former official domain redirects to Fleet Nuclear",
          "accessed": "2026-11-11"
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "ge-vernova-hitachi",
      "name": "GE Vernova Hitachi Nuclear Energy",
      "url": "https://www.gevernova.com/nuclear",
      "summary": "Designs the BWRX-300, a 300 MWe boiling-water SMR, and supplies it to utilities. The first unit is under construction at OPG’s Darlington site in Ontario, and TVA holds a US construction permit for Clinch River.",
      "hq": "US",
      "tags": [
        "LWR",
        "Data-center deal",
        "Construction approved"
      ],
      "fields": {
        "design": "BWRX-300",
        "reactor_type": "LWR",
        "size_class": "Small",
        "mwe_per_module": 300,
        "mwt_per_module": null,
        "fuel": null,
        "licensing_stage": "Construction licensed",
        "regulators": "CNSC; NRC",
        "licensing_detail": "CNSC issued OPG a licence to construct one BWRX-300 at Darlington on 2025-04-04. NRC issued TVA a construction permit for Clinch River Unit 1 on 2026-09-29, the first US permit for the design. OPG’s 2026-11-10 update says Unit 1 will miss its earlier October 2030 commercial-operation target; a replacement schedule is not yet published.",
        "licensing_date": "2026-09-29",
        "foak_site": "Darlington, Ontario (OPG): four units planned, Unit 1 under construction",
        "foak_year": null,
        "ownership": "Subsidiary",
        "ticker": null,
        "funding": "US DOE awarded TVA $400 million on 2025-12-02 to accelerate the Clinch River BWRX-300.",
        "dc_deal": true,
        "dc_partners": "Crusoe (via Blue Energy)",
        "dc_deals": "Blue Energy signed a power agreement with Crusoe (November 2025) for an AI campus at Port of Victoria, Texas: gas power from 2028, nuclear by 2031. In August 2026 Blue Energy signed an engineering and licensing agreement with GE Vernova Hitachi for up to five BWRX-300s from 2032 to power a nearby data center.",
        "hq_country": "United States",
        "hq_region": "North America",
        "listed": null
      },
      "sources": [
        {
          "url": "https://www.gevernova.com/news/press-releases/us-department-energy-announces-400-million-funding-accelerate-deployment-nation-first-commercial-small-modular-nuclear-reactor",
          "title": "GE Vernova: DOE $400M for first US SMR",
          "accessed": "2026-11-11",
          "fields": [
            "funding",
            "hq_country",
            "hq_region",
            "ownership"
          ]
        },
        {
          "url": "https://www.gevernova.com/news/press-releases/nrc-issues-first-us-construction-permit-bwrx-300-small-modular-reactor-tva-clinch-river",
          "title": "GE Vernova: Clinch River permit, 29 September 2026",
          "accessed": "2026-11-11",
          "fields": [
            "design",
            "licensing_date",
            "licensing_detail",
            "licensing_stage",
            "regulators",
            "reactor_type",
            "mwe_per_module",
            "size_class"
          ]
        },
        {
          "url": "https://www.cnsc-ccsn.gc.ca/eng/reactors/new-reactor-power-plant-projects/new-reactor-power-plant-facilities/darlington-new-nuclear-project/",
          "title": "CNSC: Darlington licence to construct; operating application under review",
          "accessed": "2026-11-11",
          "fields": [
            "foak_site",
            "licensing_detail",
            "regulators"
          ]
        },
        {
          "url": "https://www.opg.com/projects-services/projects/nuclear/smr/darlington-smr/",
          "title": "OPG 10 November 2026 update: October 2030 target and original budget no longer expected",
          "accessed": "2026-11-11",
          "fields": [
            "foak_site",
            "licensing_detail"
          ]
        },
        {
          "url": "https://www.gevernova.com/news/press-releases/blue-energy-ge-vernova-hitachi-launch-next-phase-gas-plus-nuclear-project",
          "title": "GE Vernova: Blue Energy engineering agreement, five BWRX-300s from 2032",
          "accessed": "2026-11-11",
          "fields": [
            "dc_deal",
            "dc_deals"
          ]
        },
        {
          "url": "https://wnn.world-nuclear.org/articles/blue-energy-and-crusoe-unveil-texas-nuclear-powered-data-centre-plan",
          "title": "WNN: Crusoe named as Texas data-center partner",
          "accessed": "2026-11-11",
          "fields": [
            "dc_partners",
            "dc_deals"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "general-atomics",
      "name": "General Atomics",
      "url": "https://www.ga.com/",
      "summary": "Develops the helium-cooled Fast Modular Reactor for distributed electricity supply. Its current FMR page specifies 44 MWe per module, replacing the 50 MWe concept announced in 2020.",
      "tags": [
        "Gas-cooled fast"
      ],
      "fields": {
        "design": "Fast Modular Reactor (FMR)",
        "reactor_type": "Gas-cooled fast",
        "size_class": "Small",
        "mwe_per_module": 44,
        "mwt_per_module": null,
        "fuel": "Uranium dioxide (UO2), SiGA silicon-carbide cladding",
        "licensing_stage": null,
        "regulators": null,
        "licensing_detail": null,
        "licensing_date": null,
        "foak_site": null,
        "foak_year": null,
        "ownership": null,
        "ticker": null,
        "funding": null,
        "dc_deal": null,
        "dc_partners": null,
        "dc_deals": null,
        "hq_country": null,
        "hq_region": null,
        "listed": null
      },
      "sources": [
        {
          "url": "https://www.ga.com/fission-energy-systems/gas-cooled-fast-modular-reactor",
          "title": "General Atomics: current 44 MWe helium-cooled FMR",
          "accessed": "2026-11-11",
          "fields": [
            "design",
            "reactor_type",
            "mwe_per_module",
            "size_class",
            "fuel"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "hadron-energy",
      "name": "Hadron Energy",
      "url": "https://hadronenergy.com/",
      "summary": "Listed developer of the Halo micro-modular reactor, designed to deliver 10 MWe from a truck-transportable vessel, core and containment.",
      "hq": "US",
      "tags": [
        "Microreactor",
        "Listed"
      ],
      "fields": {
        "design": "Halo MMR",
        "reactor_type": null,
        "size_class": "Micro",
        "mwe_per_module": 10,
        "mwt_per_module": null,
        "fuel": null,
        "licensing_stage": null,
        "regulators": null,
        "licensing_detail": null,
        "licensing_date": null,
        "foak_site": "Smartland Energy MOU for up to five units; first deployment in the early 2030s",
        "foak_year": null,
        "ownership": "Public",
        "ticker": "NASDAQ: HDRN",
        "funding": "Merged with GigCapital7 (SPAC) at a $600 million valuation; shareholders approved 2026-05-07, trading on Nasdaq from late May 2026; about $31 million net proceeds.",
        "dc_deal": null,
        "dc_partners": null,
        "dc_deals": null,
        "hq_country": "United States",
        "hq_region": "North America",
        "listed": "2026-05-26"
      },
      "sources": [
        {
          "url": "https://businesswire.com/news/home/20260420179986/en/Hadron-Energy-Aligns-Valuation-for-Business-Combination-to-$600M-Signaling-Long-Term-Market-Discipline-After-GigCapital7-Form-S-4-Registration-Statement-Declared-Effective",
          "title": "Hadron Energy: business combination valuation",
          "accessed": "2026-11-11",
          "fields": [
            "design",
            "funding",
            "hq_country",
            "hq_region",
            "mwe_per_module",
            "size_class",
            "ticker"
          ]
        },
        {
          "url": "https://pulse2.com/hadron-energy-spac-merger-with-gigcapital7-completed-ahead-of-nasdaq-debut/",
          "title": "Hadron Energy SPAC merger completed",
          "accessed": "2026-11-11",
          "fields": [
            "funding",
            "ownership",
            "ticker",
            "listed"
          ]
        },
        {
          "url": "https://www.nasdaq.com/press-release/hadron-energy-secures-strategic-investment-and-multi-project-nuclear-deployment",
          "title": "Hadron Energy and Smartland Energy framework",
          "accessed": "2026-11-11",
          "fields": [
            "foak_site"
          ]
        },
        {
          "url": "https://smrintel.com/news/advanced-nuclear-deals-july-2026-industry-update",
          "title": "SMR Intel: July 2026 deals",
          "accessed": "2026-11-11",
          "fields": [
            "funding"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "hexana",
      "name": "Hexana",
      "url": "https://www.hexana.fr/",
      "summary": "CEA spin-off designing a plant of two 400 MWt sodium-cooled fast reactors coupled to thermal storage, for electricity and industrial heat.",
      "hq": "FR",
      "tags": [
        "Sodium-cooled"
      ],
      "fields": {
        "design": "Hexana (two-reactor SFR plant with thermal storage)",
        "reactor_type": "Sodium-cooled",
        "size_class": null,
        "mwe_per_module": null,
        "mwt_per_module": 400,
        "fuel": null,
        "licensing_stage": "Design review",
        "regulators": "ASNR",
        "licensing_detail": "Requested an ASNR opinion on a first safety option on 2026-09-30.",
        "licensing_date": "2026-09-30",
        "foak_site": null,
        "foak_year": 2035,
        "ownership": "Private",
        "ticker": null,
        "funding": "€25 million (March 2025): €15 million equity plus a €10 million Bpifrance grant under France 2030.",
        "dc_deal": null,
        "dc_partners": null,
        "dc_deals": null,
        "hq_country": "France",
        "hq_region": "Europe",
        "listed": null
      },
      "sources": [
        {
          "url": "https://regulation-oversight.asnr.fr/oversight/small-modular-reactors/smr-projects",
          "title": "ASNR: SMR projects",
          "accessed": "2026-11-11",
          "fields": [
            "licensing_date",
            "licensing_detail",
            "licensing_stage",
            "mwt_per_module",
            "reactor_type",
            "regulators"
          ]
        },
        {
          "url": "https://www.cea.fr/english/Pages/innovation/start-ups/hexana.aspx",
          "title": "CEA: Hexana start-up",
          "accessed": "2026-11-11",
          "fields": [
            "design",
            "foak_year",
            "hq_country",
            "hq_region"
          ]
        },
        {
          "url": "https://app.dealroom.co/news/feed/hexana-secures-25m-for-sfr-development",
          "title": "Hexana secures €25m for SFR development",
          "accessed": "2026-11-11",
          "fields": [
            "funding",
            "ownership"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "holtec",
      "name": "Holtec International",
      "url": "https://holtecinternational.com/",
      "summary": "Nuclear equipment, decommissioning and plant-restart company developing the SMR-300 pressurized-water reactor. Its first two units, Pioneer 1 and 2, are planned at the Palisades site in Michigan.",
      "hq": "US",
      "tags": [
        "LWR"
      ],
      "fields": {
        "design": "SMR-300",
        "reactor_type": "LWR",
        "size_class": "Medium",
        "mwe_per_module": 340,
        "mwt_per_module": 1000,
        "fuel": null,
        "licensing_stage": "Construction under review",
        "regulators": "NRC",
        "licensing_detail": "NRC accepted Part 1 of the phased construction permit application, including a limited work authorization request, on 2026-02-13, and granted an early-site-work exemption dated 2026-08-28. Holtec then filed the PSAR, completing the second phase of the application; NRC expects to finish its reviews by early to mid-2027.",
        "licensing_date": "2026-02-13",
        "foak_site": "Pioneer Units 1 and 2, Palisades Energy Center, Michigan (two proposed units of approximately 340 MWe each)",
        "foak_year": null,
        "ownership": "Private",
        "ticker": null,
        "funding": "Holtec postponed its proposed IPO on 2026-09-17 and said it would maintain the SEC registration statement. The offering did not price; HNUC was a proposed symbol, not a listed ticker.",
        "dc_deal": null,
        "dc_partners": null,
        "dc_deals": null,
        "hq_country": "United States",
        "hq_region": "North America",
        "listed": null
      },
      "sources": [
        {
          "url": "https://holtecinternational.com/products-and-services/smr/",
          "title": "Holtec: current SMR-300 specification (340 MWe net; FAQ still states 320 MWe)",
          "accessed": "2026-11-11",
          "fields": [
            "design",
            "reactor_type",
            "mwe_per_module",
            "mwt_per_module",
            "size_class"
          ]
        },
        {
          "url": "https://www.nrc.gov/sites/default/files/cdn/doc-collection-news/2026/26-008.pdf",
          "title": "NRC 26-008: two proposed units of approximately 340 MWe each",
          "accessed": "2026-11-11",
          "fields": [
            "design",
            "mwe_per_module",
            "foak_site"
          ]
        },
        {
          "url": "https://www.nrc.gov/facilities-safety/new-reactors/advanced-reactors/who-were-working-with/advanced-reactor-application-projects/pioneer-units-1-and-2-limited-work-authorization-application/pioneer-eis",
          "title": "NRC: Pioneer phased construction permit review",
          "accessed": "2026-11-11",
          "fields": [
            "licensing_stage",
            "licensing_date",
            "licensing_detail",
            "regulators",
            "foak_site"
          ]
        },
        {
          "url": "https://holtecinternational.com/hh-41-21/",
          "title": "Holtec: IPO postponed on 17 September 2026",
          "accessed": "2026-11-11",
          "fields": [
            "funding",
            "ownership",
            "hq_country",
            "hq_region"
          ]
        },
        {
          "url": "https://www.world-nuclear-news.org/articles/second-part-of-construction-permit-application-submitted-for-pioneer-smrs",
          "title": "WNN: Second part of Palisades SMR construction permit application submitted",
          "accessed": "2026-11-11",
          "fields": [
            "licensing_detail"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "jimmy-energy",
      "name": "Jimmy Energy",
      "url": "https://www.jimmy-energy.eu/",
      "summary": "French developer of a 20 MW thermal high-temperature gas reactor that delivers industrial process heat. Its first application covers a unit at Cristal Union’s Bazancourt sugar site.",
      "hq": "FR",
      "tags": [
        "HTGR",
        "Microreactor"
      ],
      "fields": {
        "design": "Jimmy high-temperature heat generator (INB Fermi)",
        "reactor_type": "HTGR",
        "size_class": "Micro",
        "mwe_per_module": null,
        "mwt_per_module": 20,
        "fuel": "TRISO",
        "licensing_stage": "Construction under review",
        "regulators": "ASNR",
        "licensing_detail": "Creation authorization application for a reactor at Bazancourt filed 2024-05-04, the first SMR application in France; ministry asked for more information 2025-02-13; updated design filed 2026-07-23 and sent to ASNR for technical review the next day.",
        "licensing_date": "2026-07-23",
        "foak_site": "Bazancourt (Marne), supplying heat to Cristal Union’s industrial facility",
        "foak_year": null,
        "ownership": null,
        "ticker": null,
        "funding": null,
        "dc_deal": null,
        "dc_partners": null,
        "dc_deals": null,
        "hq_country": "France",
        "hq_region": "Europe",
        "listed": null
      },
      "sources": [
        {
          "url": "https://regulation-oversight.asnr.fr/oversight/small-modular-reactors/smr-projects",
          "title": "ASNR: SMR projects",
          "accessed": "2026-11-11",
          "fields": [
            "design",
            "foak_site",
            "hq_country",
            "hq_region",
            "licensing_date",
            "licensing_detail",
            "licensing_stage",
            "mwt_per_module",
            "reactor_type",
            "regulators",
            "size_class"
          ]
        },
        {
          "url": "https://regulation-oversight.asnr.fr/oversight/small-modular-reactors/smr-projects-and-their-fuel-manufacturing-and-assembly-plants",
          "title": "ASNR: SMR fuel plants (Marie Curie TRISO plant)",
          "accessed": "2026-11-11",
          "fields": [
            "fuel"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "kairos-power",
      "name": "Kairos Power",
      "url": "https://kairospower.com/",
      "summary": "Designs the KP-FHR, a fluoride-salt-cooled high-temperature reactor using TRISO pebble fuel, and builds its own demonstration plants in Oak Ridge, Tennessee. Google is its anchor customer.",
      "hq": "US",
      "tags": [
        "Molten salt",
        "Data-center deal",
        "Construction approved"
      ],
      "fields": {
        "design": "KP-FHR; Hermes; Hermes 2",
        "reactor_type": "Molten salt",
        "size_class": "Small",
        "mwe_per_module": 75,
        "mwt_per_module": null,
        "fuel": "TRISO pebbles",
        "licensing_stage": "Construction licensed",
        "regulators": "NRC",
        "licensing_detail": "NRC issued construction permits for Hermes 2 on 2024-11-21 (after Hermes in 2023); Kairos plans to run Hermes 2 as one 50 MWe reactor and broke ground in April 2026.",
        "licensing_date": "2024-11-21",
        "foak_site": "Hermes 2, Oak Ridge, Tennessee: 50 MWe sold to TVA",
        "foak_year": 2030,
        "ownership": "Private",
        "ticker": null,
        "funding": null,
        "dc_deal": true,
        "dc_partners": "Google",
        "dc_deals": "Google agreement (October 2024) for 500 MW by 2035. TVA PPA (2025-08-18) for up to 50 MW from Hermes 2 onto the grid that serves Google data centers, the first US utility PPA for a Gen IV reactor.",
        "hq_country": "United States",
        "hq_region": "North America",
        "listed": null
      },
      "sources": [
        {
          "url": "https://kairospower.com/iterative-development",
          "title": "Kairos Power: iterative development",
          "accessed": "2026-11-11",
          "fields": [
            "design",
            "fuel",
            "mwe_per_module",
            "reactor_type",
            "size_class"
          ]
        },
        {
          "url": "https://www.nrc.gov/facilities-safety/non-power-facilities/new-facility-licensing/hermes-2-kairos-application",
          "title": "NRC: Hermes 2 permits issued 21 November 2024",
          "accessed": "2026-11-11",
          "fields": [
            "licensing_stage",
            "licensing_detail",
            "regulators",
            "licensing_date"
          ]
        },
        {
          "url": "https://www.kairospower.com/updates/kairos-power-breaks-ground-on-hermes-2-demonstration-plant",
          "title": "Kairos: April 2026 Hermes 2 groundbreaking",
          "accessed": "2026-11-11",
          "fields": [
            "foak_site",
            "licensing_detail"
          ]
        },
        {
          "url": "https://www.kairospower.com/updates/google-kairos-power-tva-collaborate-to-meet-americas-growing-energy-needs",
          "title": "Kairos: Google and TVA collaboration and PPA",
          "accessed": "2026-11-11",
          "fields": [
            "dc_deal",
            "dc_deals",
            "dc_partners",
            "foak_site",
            "foak_year",
            "hq_country",
            "hq_region",
            "ownership"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "khnp",
      "name": "KHNP (i-SMR)",
      "url": "https://cms.khnp.co.kr/eng/main.do",
      "summary": "Korea Hydro & Nuclear Power leads the consortium with KAERI developing the i-SMR, a 170 MWe integral PWR planned as four-module, 680 MWe plants.",
      "hq": "KR",
      "tags": [
        "LWR"
      ],
      "fields": {
        "design": "i-SMR",
        "reactor_type": "LWR",
        "size_class": "Small",
        "mwe_per_module": 170,
        "mwt_per_module": null,
        "fuel": null,
        "licensing_stage": "Design review",
        "regulators": "NSSC (Korea)",
        "licensing_detail": "KHNP–KAERI consortium applied to the NSSC for standard design approval on 2026-02-27; technical review by KINS follows, completion targeted by end of 2028.",
        "licensing_date": "2026-02-27",
        "foak_site": "First domestic plant: four 170 MWe modules (680 MWe)",
        "foak_year": 2035,
        "ownership": "State-owned",
        "ticker": null,
        "funding": null,
        "dc_deal": null,
        "dc_partners": null,
        "dc_deals": null,
        "hq_country": "South Korea",
        "hq_region": "Asia",
        "listed": null
      },
      "sources": [
        {
          "url": "https://world-nuclear-news.org/articles/standard-design-approval-sought-for-i-smr",
          "title": "WNN: Standard design approval sought for i-SMR",
          "accessed": "2026-11-11",
          "fields": [
            "design",
            "hq_country",
            "hq_region",
            "licensing_date",
            "licensing_detail",
            "licensing_stage",
            "mwe_per_module",
            "ownership",
            "reactor_type",
            "regulators",
            "size_class"
          ]
        },
        {
          "url": "https://www.asiae.co.kr/en/article/2026022616575528262",
          "title": "Asia Economy: i-SMR standard design approval application",
          "accessed": "2026-11-11",
          "fields": [
            "foak_site",
            "foak_year",
            "licensing_detail"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "last-energy",
      "name": "Last Energy",
      "url": "https://www.lastenergy.com/",
      "summary": "Builds the PWR-20, a 20 MWe factory-made pressurized-water microreactor, and sells power from it to data centers and industry. Its PWR-5 pilot is at Texas A&M’s RELLIS campus.",
      "hq": "US",
      "tags": [
        "LWR",
        "Microreactor"
      ],
      "fields": {
        "design": "PWR-20; PWR-5 pilot",
        "reactor_type": "LWR",
        "size_class": "Micro",
        "mwe_per_module": 20,
        "mwt_per_module": null,
        "fuel": "LEU UO2 (conventional PWR fuel)",
        "licensing_stage": "DOE test authorization",
        "regulators": "DOE",
        "licensing_detail": "PWR-20 selected for the DOE Reactor Pilot Program in August 2025. DOE approved the PWR-5 preliminary documented safety analysis; construction at RELLIS nearing completion in late 2026.",
        "licensing_date": null,
        "foak_site": "Texas A&M RELLIS campus, Bryan, Texas (PWR-5 pilot); Haskell County, Texas (30 PWR-20s, ERCOT connection requested)",
        "foak_year": 2026,
        "ownership": "Private",
        "ticker": null,
        "funding": "Series C of more than $100 million led by the Astera Institute (December 2025).",
        "dc_deal": null,
        "dc_partners": null,
        "dc_deals": null,
        "hq_country": "United States",
        "hq_region": "North America",
        "listed": null
      },
      "sources": [
        {
          "url": "https://www.datacenterdynamics.com/en/news/last-energy-to-build-pilot-microreactor-in-bryan-texas-as-part-of-its-drive-to-power-data-center-market/",
          "title": "DCD: Last Energy pilot microreactor in Bryan",
          "accessed": "2026-11-11",
          "fields": [
            "design",
            "foak_site",
            "foak_year",
            "hq_country",
            "hq_region",
            "licensing_detail",
            "mwe_per_module",
            "reactor_type",
            "size_class"
          ]
        },
        {
          "url": "https://www.lastenergy.com/news-press/last-energy-receives-doe-approval-of-pwr-5-preliminary-documented-safety-analysis",
          "title": "Last Energy: DOE approves PWR-5 PDSA",
          "accessed": "2026-11-11",
          "fields": [
            "licensing_detail",
            "licensing_stage",
            "regulators"
          ]
        },
        {
          "url": "https://inspenet.com/en/news/last-energy-to-deploy-30-microreactors-in-texas-to-power-data-centers/",
          "title": "Last Energy to deploy 30 microreactors in Texas",
          "accessed": "2026-11-11",
          "fields": [
            "foak_site",
            "fuel"
          ]
        },
        {
          "url": "https://builtin.com/articles/last-energy-raises-100m-series-c-20251218",
          "title": "Built In: Last Energy raises $100M Series C",
          "accessed": "2026-11-11",
          "fields": [
            "funding",
            "ownership"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "moltex-energy",
      "name": "Moltex Energy",
      "url": "https://www.moltexenergy.com/",
      "summary": "Canadian developer of the SSR-W, a 300 MWe molten salt reactor that burns fuel recycled from CANDU spent fuel with its WATSS process, planned at Point Lepreau.",
      "hq": "CA",
      "tags": [
        "Molten salt"
      ],
      "fields": {
        "design": "SSR-W (Stable Salt Reactor – Wasteburner)",
        "reactor_type": "Molten salt",
        "size_class": "Small",
        "mwe_per_module": 300,
        "mwt_per_module": null,
        "fuel": "Recycled spent-fuel salt (WATSS)",
        "licensing_stage": "Design review",
        "regulators": "CNSC",
        "licensing_detail": "Completed Phase 1 of the CNSC pre-licensing vendor design review in May 2021; Phase 2 under way.",
        "licensing_date": "2021-05-01",
        "foak_site": "Point Lepreau, New Brunswick",
        "foak_year": null,
        "ownership": "Private",
        "ticker": null,
        "funding": "Canada’s Strategic Innovation Fund invested $47.5 million, matched by Moltex, for SSR-W, WATSS and VDR Phase 2.",
        "dc_deal": null,
        "dc_partners": null,
        "dc_deals": null,
        "hq_country": "Canada",
        "hq_region": "North America",
        "listed": null
      },
      "sources": [
        {
          "url": "https://www.moltexenergy.com/moltex-presents-updated-watss-ssr-w-fuel-recycling-vision-at-canadian-nuclear-society-conference/",
          "title": "Moltex: WATSS–SSR-W fuel recycling vision",
          "accessed": "2026-11-11",
          "fields": [
            "design",
            "fuel",
            "hq_country",
            "hq_region",
            "reactor_type"
          ]
        },
        {
          "url": "https://www.ans.org/news/article-2746/canada-invests-40m-in-moltex-smr-technology",
          "title": "ANS: Canada invests in Moltex SMR technology",
          "accessed": "2026-11-11",
          "fields": [
            "funding",
            "licensing_date",
            "licensing_detail",
            "licensing_stage",
            "ownership",
            "regulators"
          ]
        },
        {
          "url": "https://world-nuclear.org/our-association/publications/world-nuclear-outlook-report/canada---world-nuclear-outlook-report",
          "title": "WNA: Canada outlook (Point Lepreau 300 MW MSR)",
          "accessed": "2026-11-11",
          "fields": [
            "foak_site",
            "mwe_per_module",
            "size_class"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "nano-nuclear",
      "name": "NANO Nuclear Energy",
      "url": "https://nanonuclearenergy.com/",
      "summary": "Listed microreactor developer whose KRONOS MMR is a 15 MWe high-temperature gas-cooled reactor. The first unit is planned on the University of Illinois Urbana-Champaign campus.",
      "hq": "US",
      "tags": [
        "HTGR",
        "Microreactor",
        "Data-center deal",
        "Listed"
      ],
      "fields": {
        "design": "KRONOS MMR",
        "reactor_type": "HTGR",
        "size_class": "Micro",
        "mwe_per_module": 15,
        "mwt_per_module": 45,
        "fuel": null,
        "licensing_stage": "Construction under review",
        "regulators": "NRC",
        "licensing_detail": "University of Illinois submitted the KRONOS construction permit application on 2026-03-31; NRC docketed it on 2026-05-18 and set the review schedule on 2026-06-16.",
        "licensing_date": "2026-05-18",
        "foak_site": "University of Illinois Urbana-Champaign campus",
        "foak_year": null,
        "ownership": "Public",
        "ticker": "NASDAQ: NNE",
        "funding": null,
        "dc_deal": true,
        "dc_partners": "Tillman Digital Gateway; Supermicro",
        "dc_deals": "Non-binding framework with Tillman Digital Gateway (2026-08-24) targeting 2 GW by the mid-2030s and 6 GW by 2040, with up to $100M in milestone warrants; MOU with Supermicro on on-site reactors for AI data centers (2026-05-06).",
        "hq_country": "United States",
        "hq_region": "North America",
        "listed": "2024-05-08"
      },
      "sources": [
        {
          "url": "https://www.nrc.gov/reactors/new-reactors/advanced/who-were-working-with/applicant-projects/kronos",
          "title": "NRC: KRONOS project",
          "accessed": "2026-11-11",
          "fields": [
            "design",
            "foak_site",
            "licensing_detail",
            "licensing_stage",
            "regulators",
            "mwt_per_module"
          ]
        },
        {
          "url": "https://www.ans.org/news/article-7904/uiuc-submits-mmr-construction-permit-application",
          "title": "ANS: UIUC submits MMR construction permit application",
          "accessed": "2026-11-11",
          "fields": [
            "foak_site",
            "licensing_detail"
          ]
        },
        {
          "url": "https://marketchameleon.com/articles/b/2026/5/20/nano-nuclear-kronos-mmr-nrc-milestone-microreactor-commercialization",
          "title": "KRONOS MMR selected for full NRC review",
          "accessed": "2026-11-11",
          "fields": [
            "licensing_date",
            "licensing_detail"
          ]
        },
        {
          "url": "https://interestingengineering.com/energy/nano-nuclear-15-mwe-gen-iv-modular-microreactor-to-undergo-us-nrc-review",
          "title": "NANO Nuclear 15 MWe Gen IV microreactor",
          "accessed": "2026-11-11",
          "fields": [
            "mwe_per_module",
            "reactor_type",
            "size_class"
          ]
        },
        {
          "url": "https://www.power-eng.com/nuclear/new-collaboration-targets-up-to-6-gw-of-new-nuclear-for-data-centers/",
          "title": "Power Engineering: up to 6 GW for data centers",
          "accessed": "2026-11-11",
          "fields": [
            "dc_deal",
            "dc_deals",
            "dc_partners",
            "hq_country",
            "hq_region",
            "ownership",
            "ticker"
          ]
        },
        {
          "url": "https://nanonuclearenergy.com/nano-nuclear-signs-strategic-mou-with-supermicro-to-power-the-next-generation-of-ai-data-centers-with-advanced-nuclear-energy/",
          "title": "NANO Nuclear: MOU with Supermicro",
          "accessed": "2026-11-11",
          "fields": [
            "dc_deals",
            "dc_partners"
          ]
        },
        {
          "url": "https://nanonuclearenergy.com/nano-nuclear-energy-announces-pricing-of-initial-public-offering/",
          "title": "NANO Nuclear: IPO pricing, Nasdaq trading from 8 May 2024",
          "accessed": "2026-11-11",
          "fields": [
            "listed"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "natura-resources",
      "name": "Natura Resources",
      "url": "https://naturaresources.com/",
      "summary": "Texas developer of liquid-fuelled molten salt reactors. Its 1 MWt MSR-1 at Abilene Christian University holds an NRC construction permit issued in 2024; the MSR-100 is the 100 MWe commercial design.",
      "hq": "US",
      "tags": [
        "Molten salt",
        "Construction approved"
      ],
      "fields": {
        "design": "MSR-1; MSR-100",
        "reactor_type": "Molten salt",
        "size_class": "Small",
        "mwe_per_module": 100,
        "mwt_per_module": null,
        "fuel": "Uranium dissolved in fuel salt",
        "licensing_stage": "Construction licensed",
        "regulators": "NRC",
        "licensing_detail": "NRC issued ACU’s MSR-1 construction permit on 2024-09-16. The 1 MWt research reactor does not generate electricity; the 100 MWe rating belongs to the separate commercial MSR-100 design.",
        "licensing_date": "2024-09-16",
        "foak_site": "Abilene Christian University, Abilene, Texas (MSR-1); Texas A&M RELLIS (MSR-100)",
        "foak_year": null,
        "ownership": "Private",
        "ticker": null,
        "funding": null,
        "dc_deal": null,
        "dc_partners": null,
        "dc_deals": null,
        "hq_country": "United States",
        "hq_region": "North America",
        "listed": null
      },
      "sources": [
        {
          "url": "https://acu.edu/2024/09/23/nrc-issues-construction-permit-for-natura-resources-molten-salt-reactor-at-acu/",
          "title": "ACU: MSR-1 demonstration and separate 100 MWe commercial systems",
          "accessed": "2026-11-11",
          "fields": [
            "design",
            "mwe_per_module",
            "size_class",
            "foak_site"
          ]
        },
        {
          "url": "https://www.power-eng.com/nuclear/advanced-nuclear-reactor-developer-eyes-texas-for-two-new-projects/",
          "title": "Power Engineering: Natura eyes Texas for two projects",
          "accessed": "2026-11-11",
          "fields": [
            "foak_site",
            "fuel",
            "hq_country",
            "hq_region",
            "mwe_per_module",
            "ownership",
            "size_class"
          ]
        },
        {
          "url": "https://www.nrc.gov/cdn/doc-collection-news/2024/24-071.pdf",
          "title": "NRC: ACU construction permit; liquid-fuelled non-power research reactor",
          "accessed": "2026-11-11",
          "fields": [
            "licensing_date",
            "licensing_detail",
            "licensing_stage",
            "reactor_type",
            "regulators",
            "fuel"
          ]
        },
        {
          "url": "https://acu.edu/research/next-lab/next-lab-faqs/",
          "title": "ACU NEXT Lab FAQ: operation targeted by end of 2026",
          "accessed": "2026-11-11",
          "fields": [
            "foak_year",
            "licensing_detail",
            "foak_site"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "newcleo",
      "name": "newcleo",
      "url": "https://www.newcleo.com/",
      "summary": "Develops lead-cooled fast reactors fuelled with MOX made from recycled plutonium, starting with the 30 MWe LFR-AS-30 and its MOX plant in France.",
      "tags": [
        "Lead-cooled",
        "Data-center deal"
      ],
      "fields": {
        "design": "LFR-AS-30; LFR-AS-200",
        "reactor_type": "Lead-cooled",
        "size_class": null,
        "mwe_per_module": null,
        "mwt_per_module": 90,
        "fuel": "MOX",
        "licensing_stage": "Design review",
        "regulators": "ASNR",
        "licensing_detail": "Requested an ASNR opinion on LFR-AS-30 safety options on 2025-12-19. Its pilot MOX-LFR fuel plant received an ASNR opinion in 2026.",
        "licensing_date": "2025-12-19",
        "foak_site": null,
        "foak_year": null,
        "ownership": "Private",
        "ticker": null,
        "funding": "$85 million round closed February 2026, more than $125 million in 12 months and over $755 million since 2021.",
        "dc_deal": true,
        "dc_partners": "Evroc",
        "dc_deals": "Non-binding MoU with Evroc and Studsvik to explore an SMR-powered data center at Nyköping, Sweden.",
        "hq_country": null,
        "hq_region": null,
        "listed": null
      },
      "sources": [
        {
          "url": "https://regulation-oversight.asnr.fr/oversight/small-modular-reactors/smr-projects",
          "title": "ASNR: SMR projects",
          "accessed": "2026-11-11",
          "fields": [
            "design",
            "licensing_date",
            "licensing_detail",
            "licensing_stage",
            "mwt_per_module",
            "reactor_type",
            "regulators"
          ]
        },
        {
          "url": "https://www.nucnet.org/news/european-nuclear-company-newcleo-closes-latest-funding-round-of-usd85-million-2-3-2026",
          "title": "NucNet: newcleo closes $85M round",
          "accessed": "2026-11-11",
          "fields": [
            "fuel",
            "funding",
            "ownership"
          ]
        },
        {
          "url": "https://www.datacenterdynamics.com/en/tags/newcleo/",
          "title": "DCD: newcleo coverage (Evroc, Studsvik MoU)",
          "accessed": "2026-11-11",
          "fields": [
            "dc_deal",
            "dc_deals",
            "dc_partners"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "nuscale-power",
      "name": "NuScale Power",
      "url": "https://www.nuscalepower.com/",
      "summary": "Designs the NuScale Power Module, a factory-built light-water SMR, and sells plants of up to 12 modules to utilities and industrial buyers. Its US460 design holds an NRC standard design approval.",
      "hq": "US",
      "tags": [
        "LWR",
        "Listed"
      ],
      "fields": {
        "design": "NuScale US460 (NuScale Power Module)",
        "reactor_type": "LWR",
        "size_class": "Small",
        "mwe_per_module": 77,
        "mwt_per_module": null,
        "fuel": null,
        "licensing_stage": "Design approved",
        "regulators": "NRC",
        "licensing_detail": "NRC issued the US460 standard design approval on 2025-05-29, two months ahead of schedule; the earlier US600 design was certified in 2023.",
        "licensing_date": "2025-05-29",
        "foak_site": "TVA service territory via ENTRA1 Energy (up to 6 GW, six plants); RoPower Doicești, Romania (six 77 MWe modules, 462 MWe; FID approved February 2026, first module in commercial operation targeted for 2033)",
        "foak_year": null,
        "ownership": "Public",
        "ticker": "NYSE: SMR",
        "funding": "Listed on NYSE as SMR. ENTRA1, NuScale’s exclusive global partner, signed a non-binding 6 GW collaborative agreement with TVA on 2025-09-02.",
        "dc_deal": null,
        "dc_partners": null,
        "dc_deals": null,
        "hq_country": "United States",
        "hq_region": "North America",
        "listed": "2022-05-03"
      },
      "sources": [
        {
          "url": "https://www.nrc.gov/cdn/doc-collection-news/2025/25-033.pdf",
          "title": "NRC 25-033: US460 approval, 29 May 2025; 77 MWe per module",
          "accessed": "2026-11-11",
          "fields": [
            "design",
            "licensing_date",
            "licensing_detail",
            "licensing_stage",
            "mwe_per_module",
            "reactor_type",
            "regulators",
            "size_class"
          ]
        },
        {
          "url": "https://www.powermag.com/tva-entra1-sign-agreement-for-6-gw-six-plant-nuclear-smr-collaboration/",
          "title": "POWER: TVA, ENTRA1 sign 6 GW agreement",
          "accessed": "2026-11-11",
          "fields": [
            "foak_site",
            "funding"
          ]
        },
        {
          "url": "https://www.nuscalepower.com/press-releases/2026/nuscale-power-reports-fourth-quarter-and-full-year-2025-results",
          "title": "NuScale Q4 2025 results",
          "accessed": "2026-11-11",
          "fields": [
            "foak_site",
            "hq_country",
            "hq_region",
            "ownership",
            "ticker"
          ]
        },
        {
          "url": "https://www.nrc.gov/facilities-safety/new-reactors/advanced-reactors/who-were-working-with/past-licensing-activities/nuscale-us460",
          "title": "NRC: NuScale US460 standard design approval",
          "accessed": "2026-11-11",
          "fields": [
            "licensing_detail",
            "licensing_date",
            "licensing_stage"
          ]
        },
        {
          "url": "https://world-nuclear-news.org/articles/final-investment-decision-taken-for-romanias-smrs",
          "title": "WNN: Final investment decision for Romania’s SMRs (Feb 2026)",
          "accessed": "2026-11-11",
          "fields": [
            "foak_site"
          ]
        },
        {
          "url": "https://www.sec.gov/Archives/edgar/data/1822966/000110465922056493/tm2213736d7_8k.htm",
          "title": "NuScale 8-K: Class A stock began trading on NYSE as SMR on 3 May 2022",
          "accessed": "2026-11-11",
          "fields": [
            "listed"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "edf-nuward",
      "name": "Nuward (EDF)",
      "url": "https://www.nuward.com/",
      "summary": "EDF subsidiary redesigning its Nuward SMR around proven PWR technology for European customers, with a first unit planned in France.",
      "hq": "FR",
      "tags": [
        "LWR"
      ],
      "fields": {
        "design": "Nuward (redesign under way)",
        "reactor_type": "LWR",
        "size_class": null,
        "mwe_per_module": null,
        "mwt_per_module": null,
        "fuel": null,
        "licensing_stage": "Pre-licensing",
        "regulators": "ASNR and five other European regulators (joint early review)",
        "licensing_detail": "Six European regulators led by France’s ASNR completed phase 2 of a joint early review of the Nuward design. EDF relaunched development on a proven-technology basis in 2025.",
        "licensing_date": null,
        "foak_site": "France (first unit), Italy (second unit planned)",
        "foak_year": null,
        "ownership": "Subsidiary",
        "ticker": null,
        "funding": null,
        "dc_deal": null,
        "dc_partners": null,
        "dc_deals": null,
        "hq_country": "France",
        "hq_region": "Europe",
        "listed": null
      },
      "sources": [
        {
          "url": "https://world-nuclear-news.org/articles/second-phase-of-nuward-review-completed",
          "title": "WNN: Second phase of Nuward review completed",
          "accessed": "2026-11-11",
          "fields": [
            "design",
            "licensing_detail",
            "licensing_stage",
            "reactor_type",
            "regulators"
          ]
        },
        {
          "url": "https://world-nuclear-news.org/articles/edf-to-modify-nuward-design-to-aid-commercialisati",
          "title": "WNN: EDF to modify Nuward design",
          "accessed": "2026-11-11",
          "fields": [
            "hq_country",
            "hq_region",
            "licensing_detail",
            "ownership"
          ]
        },
        {
          "url": "https://www.neimagazine.com/news/edf-bets-big-on-european-smrs/",
          "title": "NEI: EDF bets big on European SMRs",
          "accessed": "2026-11-11",
          "fields": [
            "foak_site"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "oklo",
      "name": "Oklo",
      "url": "https://oklo.com/",
      "summary": "Listed developer of the Aurora powerhouse, a 75 MWe liquid-metal-cooled fast reactor sold as power, not hardware. It has announced data-center power deals with Meta, Switch and Equinix.",
      "hq": "US",
      "tags": [
        "Sodium-cooled",
        "Data-center deal",
        "Listed"
      ],
      "fields": {
        "design": "Aurora powerhouse",
        "reactor_type": "Sodium-cooled",
        "size_class": "Small",
        "mwe_per_module": 75,
        "mwt_per_module": null,
        "fuel": null,
        "licensing_stage": "Pre-licensing",
        "regulators": "NRC; DOE",
        "licensing_detail": "NRC denied Oklo’s 2020 Aurora combined licence application in January 2022; Oklo completed an NRC readiness assessment for Phase 1 of a new application in July 2025. DOE approved the Aurora-INL preliminary documented safety analysis under the Reactor Pilot Program.",
        "licensing_date": null,
        "foak_site": "Aurora-INL, Idaho National Laboratory",
        "foak_year": 2028,
        "ownership": "Public",
        "ticker": "NYSE: OKLO",
        "funding": null,
        "dc_deal": true,
        "dc_partners": "Meta; Switch; Equinix",
        "dc_deals": "Meta (2026-01-09): prepayment agreement for a 1.2 GW campus in Pike County, Ohio, first power as early as 2030. Switch (2024-12-18): non-binding 12 GW master power agreement through 2044. Equinix (2024-02-16): non-binding letter of intent for up to 500 MW, with a $25 million prepayment.",
        "hq_country": "United States",
        "hq_region": "North America",
        "listed": "2024-05-10"
      },
      "sources": [
        {
          "url": "https://www.utilitydive.com/news/oklo-75-mw-reactor-design-smr-nuclear/743578/",
          "title": "Utility Dive: Oklo 75 MW reactor design",
          "accessed": "2026-11-11",
          "fields": [
            "design",
            "mwe_per_module",
            "reactor_type",
            "size_class"
          ]
        },
        {
          "url": "https://www.nrc.gov/reactors/new-reactors/large-lwr/col/aurora-oklo/documents",
          "title": "NRC: Aurora-Oklo application documents",
          "accessed": "2026-11-11",
          "fields": [
            "licensing_detail",
            "regulators"
          ]
        },
        {
          "url": "https://www.businesswire.com/news/home/20250717644425/en/Oklo-Advances-Licensing-with-Completion-of-NRC-Readiness-Assessment",
          "title": "Oklo: NRC readiness assessment completed",
          "accessed": "2026-11-11",
          "fields": [
            "hq_country",
            "hq_region",
            "licensing_detail",
            "licensing_stage",
            "ownership",
            "ticker"
          ]
        },
        {
          "url": "https://www.nucnet.org/news/oklo-continuing-extensive-pre-application-work-after-2022-rejection-4-1-2026",
          "title": "NucNet: Aurora-INL now expected in 2028",
          "accessed": "2026-11-11",
          "fields": [
            "foak_site",
            "foak_year",
            "licensing_detail"
          ]
        },
        {
          "url": "https://www.businesswire.com/news/home/20260109127781/en/Oklo-Meta-Announce-Agreement-in-Support-of-1.2-GW-Nuclear-Energy-Development-in-Southern-Ohio",
          "title": "Oklo and Meta 1.2 GW agreement",
          "accessed": "2026-11-11",
          "fields": [
            "dc_deal",
            "dc_deals",
            "dc_partners"
          ]
        },
        {
          "url": "https://datacenterdynamics.com/en/news/switch-to-procure-up-to-12gw-of-nuclear-power-from-oklo-reactors-by-2044",
          "title": "DCD: Switch to procure up to 12 GW from Oklo",
          "accessed": "2026-11-11",
          "fields": [
            "dc_deals",
            "dc_partners"
          ]
        },
        {
          "url": "https://datacenterfrontier.com/energy/article/55309204/equinix-bets-on-nuclear-and-fuel-cells-to-meet-exploding-data-center-energy-demand",
          "title": "Data Center Frontier: Equinix nuclear deals",
          "accessed": "2026-11-11",
          "fields": [
            "dc_deals",
            "dc_partners"
          ]
        },
        {
          "url": "https://www.sec.gov/Archives/edgar/data/1849056/000162828024047875/oklo-20240930.htm",
          "title": "Oklo 10-Q: OKLO commenced trading on NYSE on 10 May 2024",
          "accessed": "2026-11-11",
          "fields": [
            "listed"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "otrera",
      "name": "Otrera New Energy",
      "url": "https://otrera.fr/",
      "summary": "Develops sodium-cooled fast reactors for electricity and industrial heat. ASNR lists the OTRERA ONE industrial prototype at 200 MWt; older OTRERA 300 electric ratings are not assigned to this prototype.",
      "hq": "FR",
      "tags": [
        "Sodium-cooled"
      ],
      "fields": {
        "design": "OTRERA ONE industrial prototype",
        "reactor_type": "Sodium-cooled",
        "size_class": null,
        "mwe_per_module": null,
        "mwt_per_module": 200,
        "fuel": null,
        "licensing_stage": "Design review",
        "regulators": "ASNR",
        "licensing_detail": "ASNR received a request for an opinion on OTRERA ONE safety options on 2026-07-30. This is a safety-options review, not a construction licence.",
        "licensing_date": "2026-07-30",
        "foak_site": null,
        "foak_year": null,
        "ownership": null,
        "ticker": null,
        "funding": null,
        "dc_deal": null,
        "dc_partners": null,
        "dc_deals": null,
        "hq_country": "France",
        "hq_region": "Europe",
        "listed": null
      },
      "sources": [
        {
          "url": "https://regulation-oversight.asnr.fr/oversight/small-modular-reactors/smr-projects-and-their-fuel-manufacturing-and-assembly-plants",
          "title": "ASNR: OTRERA ONE 200 MWt prototype and safety-options submission",
          "accessed": "2026-11-11",
          "fields": [
            "design",
            "reactor_type",
            "mwt_per_module",
            "licensing_stage",
            "regulators",
            "licensing_date",
            "licensing_detail"
          ]
        },
        {
          "url": "https://otrera.fr/en/otrera-presents-its-next-generation-nuclear-reactor-at-ces-2025/",
          "title": "Otrera: Aix-en-Provence base and sodium fast-reactor programme",
          "accessed": "2026-11-11",
          "fields": [
            "hq_country",
            "hq_region"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "radiant",
      "name": "Radiant Industries",
      "url": "https://radiantnuclear.com/",
      "summary": "Builds Kaleidos, a transportable 1 MWe helium-cooled microreactor that fits in a shipping container, for data centers, military bases and remote sites. Equinix has pre-ordered 20 units.",
      "hq": "US",
      "tags": [
        "HTGR",
        "Microreactor",
        "Data-center deal"
      ],
      "fields": {
        "design": "Kaleidos",
        "reactor_type": "HTGR",
        "size_class": "Micro",
        "mwe_per_module": 1,
        "mwt_per_module": null,
        "fuel": "HALEU TRISO",
        "licensing_stage": "DOE test authorization",
        "regulators": "DOE; NRC",
        "licensing_detail": "First reactor selected for the DOE DOME test bed at Idaho National Laboratory; Kaleidos shipped there on 2026-08-12 and received DOE approval of its documented safety analysis for full-power operation on 2026-10-29. A DOE readiness review comes next.",
        "licensing_date": "2026-10-29",
        "foak_site": "DOME test bed, Idaho National Laboratory",
        "foak_year": 2026,
        "ownership": "Private",
        "ticker": null,
        "funding": "More than $300 million Series D led by Draper Associates and Boost VC (2025-12-17); factory planned in Oak Ridge, Tennessee.",
        "dc_deal": true,
        "dc_partners": "Equinix",
        "dc_deals": "Equinix pre-ordered 20 Kaleidos microreactors with deposits (announced 2025-08-14).",
        "hq_country": "United States",
        "hq_region": "North America",
        "listed": null
      },
      "sources": [
        {
          "url": "https://radiantnuclear.com/blog/kaleidos-shipped/",
          "title": "Radiant: Kaleidos has left the building",
          "accessed": "2026-11-11",
          "fields": [
            "design",
            "foak_site",
            "foak_year",
            "fuel",
            "licensing_detail"
          ]
        },
        {
          "url": "https://offshoresource.com/business-wire/radiant-achieves-industry-milestone-as-the-only-microreactor-design-to-secure-doe-safety-analysis-approval-for-full-power-operations/",
          "title": "Radiant: DOE safety analysis approval for full power",
          "accessed": "2026-11-11",
          "fields": [
            "licensing_date",
            "licensing_detail",
            "licensing_stage",
            "regulators"
          ]
        },
        {
          "url": "https://radiantnuclear.com/blog/series-d-announcement/",
          "title": "Radiant: Series D announcement",
          "accessed": "2026-11-11",
          "fields": [
            "funding",
            "hq_country",
            "hq_region",
            "ownership",
            "reactor_type"
          ]
        },
        {
          "url": "https://www.newswire.com/news/radiant-announces-equinix-preorder-deposits-for-20-kaleidos-22625143",
          "title": "Radiant: Equinix preorder for 20 Kaleidos",
          "accessed": "2026-11-11",
          "fields": [
            "dc_deal",
            "dc_deals",
            "dc_partners",
            "mwe_per_module",
            "mwt_per_module",
            "size_class"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "rolls-royce-smr",
      "name": "Rolls-Royce SMR",
      "url": "https://www.rolls-royce-smr.com/",
      "summary": "Rolls-Royce subsidiary designing a 470 MWe factory-built pressurized-water SMR. UK government picked it for three units at Wylfa, and ČEZ plans units in the Czech Republic.",
      "hq": "GB",
      "tags": [
        "LWR",
        "Data-center deal"
      ],
      "fields": {
        "design": "Rolls-Royce SMR",
        "reactor_type": "LWR",
        "size_class": "Medium",
        "mwe_per_module": 470,
        "mwt_per_module": null,
        "fuel": null,
        "licensing_stage": "Design review",
        "regulators": "ONR; Environment Agency; NRW",
        "licensing_detail": "Completed Steps 1 and 2 of the UK Generic Design Assessment and is in Step 3, the detailed assessment, which ends with a Design Acceptance Confirmation.",
        "licensing_date": null,
        "foak_site": "Wylfa, Anglesey: three units, about 1.4 GWe, for Great British Energy–Nuclear",
        "foak_year": null,
        "ownership": "Subsidiary",
        "ticker": null,
        "funding": "Majority owned by Rolls-Royce plc; ČEZ holds about 20%, with BNF Resources and Qatar Investment Authority. Contract with Great British Energy–Nuclear signed April 2026.",
        "dc_deal": true,
        "dc_partners": "Equinix (via ULC-Energy)",
        "dc_deals": "Equinix signed a letter of intent with ULC-Energy, a Dutch nuclear developer planning Rolls-Royce SMRs, for a PPA of up to 250 MWe for its Dutch data centers (August 2025).",
        "hq_country": "United Kingdom",
        "hq_region": "Europe",
        "listed": null
      },
      "sources": [
        {
          "url": "https://www.onr.org.uk/news/all-news/2025/11/onr-comment-on-smr-siting-announcement",
          "title": "ONR: comment on SMR siting",
          "accessed": "2026-11-11",
          "fields": [
            "design",
            "licensing_detail",
            "licensing_stage",
            "regulators"
          ]
        },
        {
          "url": "https://environmentagency.blog.gov.uk/2026/07/16/regulating-modular-nuclear-reactors-from-design-and-rd-to-the-factory-floor-and-site/",
          "title": "Environment Agency: regulating modular reactors",
          "accessed": "2026-11-11",
          "fields": [
            "licensing_detail"
          ]
        },
        {
          "url": "https://www.rolls-royce.com/media/press-releases/2026/13-04-2026-rr-welcomes-contract-with-uk-government-for-delivery-of-small-modular-reactors.aspx",
          "title": "Rolls-Royce: contract with UK Government",
          "accessed": "2026-11-11",
          "fields": [
            "foak_site",
            "funding",
            "hq_country",
            "hq_region",
            "ownership"
          ]
        },
        {
          "url": "https://www.ans.org/news/article-7937/rollsroyce-gben-contract-kickstarts-uks-smr-plans-for-wylfa-site/",
          "title": "ANS: Rolls-Royce, GBE-N contract for Wylfa",
          "accessed": "2026-11-11",
          "fields": [
            "foak_site",
            "funding"
          ]
        },
        {
          "url": "https://newsroom.equinix.com/2025-08-14-Equinix-and-ULC-Energy-Collaborate-to-Support-Sustainable-AI-Data-Center-Growth-in-the-Netherlands-with-Clean-Nuclear-Power",
          "title": "Equinix and ULC-Energy",
          "accessed": "2026-11-11",
          "fields": [
            "dc_deal",
            "dc_deals",
            "dc_partners",
            "mwe_per_module",
            "reactor_type",
            "size_class"
          ]
        },
        {
          "url": "https://www.rolls-royce-smr.com/press/shareholder-update",
          "title": "Rolls-Royce SMR: shareholder update",
          "accessed": "2026-11-11",
          "fields": [
            "ownership",
            "funding"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "rosatom",
      "name": "Rosatom",
      "url": "https://rosatom.ru/en/",
      "summary": "Russia’s state nuclear corporation. It builds the RITM-200N, a 55 MWe land-based version of its icebreaker reactor, at Ust-Kuyga in Yakutia.",
      "hq": "RU",
      "tags": [
        "LWR",
        "Construction approved"
      ],
      "fields": {
        "design": "RITM-200N",
        "reactor_type": "LWR",
        "size_class": "Small",
        "mwe_per_module": 55,
        "mwt_per_module": 190,
        "fuel": null,
        "licensing_stage": "Construction licensed",
        "regulators": "Rostekhnadzor",
        "licensing_detail": "Rostekhnadzor issued the construction licence for the first land-based RITM-200N plant in April 2023.",
        "licensing_date": "2023-04-21",
        "foak_site": "Ust-Kuyga, Yakutia (Sakha Republic)",
        "foak_year": 2028,
        "ownership": "State-owned",
        "ticker": null,
        "funding": null,
        "dc_deal": null,
        "dc_partners": null,
        "dc_deals": null,
        "hq_country": "Russia",
        "hq_region": "Europe",
        "listed": null
      },
      "sources": [
        {
          "url": "https://world-nuclear-news.org/Articles/Licence-issued-for-Russia-s-first-land-based-SMR",
          "title": "WNN: Licence issued for Russia’s first land-based SMR",
          "accessed": "2026-11-11",
          "fields": [
            "design",
            "foak_site",
            "foak_year",
            "hq_country",
            "hq_region",
            "licensing_detail",
            "licensing_stage",
            "mwe_per_module",
            "mwt_per_module",
            "ownership",
            "reactor_type",
            "regulators",
            "size_class"
          ]
        },
        {
          "url": "https://fnpp.info/latest-news/rosatom-obtained-a-license-for-the-first-land-based-smr-in-russia",
          "title": "Rosatom obtained licence for first land-based SMR (21 April 2023)",
          "accessed": "2026-11-11",
          "fields": [
            "licensing_date"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "steady-energy",
      "name": "Steady Energy",
      "url": "https://www.steadyenergy.com/",
      "summary": "Finnish developer of the LDR-50, a 50 MW thermal light-water reactor that makes district heat rather than electricity. It has agreements for 15 reactors with Finnish municipalities.",
      "hq": "FI",
      "tags": [
        "LWR",
        "Microreactor"
      ],
      "fields": {
        "design": "LDR-50",
        "reactor_type": "LWR",
        "size_class": "Micro",
        "mwe_per_module": null,
        "mwt_per_module": 50,
        "fuel": null,
        "licensing_stage": "Pre-licensing",
        "regulators": "STUK",
        "licensing_detail": "STUK published the summary of an international joint early review of the LDR-50 design in 2026; no plant licence application yet.",
        "licensing_date": null,
        "foak_site": "Helsinki: non-nuclear pilot at the former Salmisaari B coal plant; agreements with Helsinki, Kuopio and Kerava",
        "foak_year": 2030,
        "ownership": "Private",
        "ticker": null,
        "funding": null,
        "dc_deal": null,
        "dc_partners": null,
        "dc_deals": null,
        "hq_country": "Finland",
        "hq_region": "Europe",
        "listed": null
      },
      "sources": [
        {
          "url": "https://smr.nucnet.org/news/finland-s-regulator-publishes-joint-early-review-of-steady-energy-small-modular-reactor-7-1-2026",
          "title": "NucNet: STUK joint early review of LDR-50",
          "accessed": "2026-11-11",
          "fields": [
            "design",
            "licensing_detail",
            "licensing_stage",
            "reactor_type",
            "regulators"
          ]
        },
        {
          "url": "https://oenergetice.cz/en/nuclear-power/finnish-regulator-publishes-preliminary-assessment-of-ldr-50-heat-producing-modular-reactor",
          "title": "Finnish regulator assessment of LDR-50",
          "accessed": "2026-11-11",
          "fields": [
            "foak_site",
            "foak_year",
            "hq_country",
            "hq_region",
            "mwt_per_module",
            "size_class"
          ]
        },
        {
          "url": "https://forumnordic.com/business/steady-energy-achieves-major-commercial-and-funding-milestones-in-decarbonizing-district-heating/",
          "title": "Steady Energy commercial and funding milestones",
          "accessed": "2026-11-11",
          "fields": [
            "foak_site",
            "ownership"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "stellaria",
      "name": "Stellaria",
      "url": "https://www.stellaria.fr/",
      "summary": "French developer of the Stellarium, a molten salt fast-neutron breed-and-burn reactor, founded in 2023 by CEA and Schneider Electric. Equinix holds the first capacity reservation.",
      "hq": "FR",
      "tags": [
        "Molten salt",
        "Data-center deal"
      ],
      "fields": {
        "design": "Stellarium; Alpha/Alvin experimental reactor",
        "reactor_type": "Molten salt",
        "size_class": "Small",
        "mwe_per_module": 250,
        "mwt_per_module": null,
        "fuel": null,
        "licensing_stage": "Construction under review",
        "regulators": "ASNR",
        "licensing_detail": "Filed for authorization of the 200 kWt Alpha/Alvin experimental reactor at CEA Cadarache on 2025-12-19; the ministry asked for more information on 2026-06-16 and the technical assessment is suspended.",
        "licensing_date": "2025-12-19",
        "foak_site": "CEA Cadarache (experimental reactor); commercial Stellarium deployments from 2035",
        "foak_year": 2035,
        "ownership": "Private",
        "ticker": null,
        "funding": "€23 million raised (July 2025).",
        "dc_deal": true,
        "dc_partners": "Equinix",
        "dc_deals": "Equinix signed a 500 MWe pre-order (August 2025), then reserved the first energy from Stellaria’s inaugural 250 MW reactor (November 2025).",
        "hq_country": "France",
        "hq_region": "Europe",
        "listed": null
      },
      "sources": [
        {
          "url": "https://regulation-oversight.asnr.fr/oversight/small-modular-reactors/smr-projects",
          "title": "ASNR: SMR projects",
          "accessed": "2026-11-11",
          "fields": [
            "design",
            "foak_site",
            "licensing_date",
            "licensing_detail",
            "licensing_stage",
            "reactor_type",
            "regulators"
          ]
        },
        {
          "url": "https://www.datacenterdynamics.com/en/news/equinix-secures-first-energy-capacity-reservation-from-french-smr-company-stellarias-inaugural-250mw-reactor/",
          "title": "DCD: Equinix secures first capacity from Stellaria",
          "accessed": "2026-11-11",
          "fields": [
            "dc_deal",
            "dc_deals",
            "dc_partners",
            "foak_year",
            "funding",
            "hq_country",
            "hq_region",
            "mwe_per_module",
            "ownership",
            "size_class"
          ]
        },
        {
          "url": "https://world-nuclear-news.org/articles/equinix-signs-up-for-power-from-first-stellaria-reactor",
          "title": "WNN: Equinix signs up for power from first Stellaria reactor",
          "accessed": "2026-11-11",
          "fields": [
            "dc_deals",
            "foak_year"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "terra-innovatum",
      "name": "Terra Innovatum",
      "url": "https://terrainnovatum.com/",
      "summary": "Listed developer of SOLO, a helium-cooled micro-modular reactor rated at 1 MWe, aimed at industrial sites, mines and data centers.",
      "tags": [
        "HTGR",
        "Microreactor",
        "Listed"
      ],
      "fields": {
        "design": "SOLO",
        "reactor_type": "HTGR",
        "size_class": "Micro",
        "mwe_per_module": 1,
        "mwt_per_module": null,
        "fuel": null,
        "licensing_stage": "Pre-licensing",
        "regulators": "NRC",
        "licensing_detail": "NRC docketed several SOLO topical reports in March 2026, opening formal review; safety evaluations expected October 2026. Construction permit targeted for 2027.",
        "licensing_date": null,
        "foak_site": null,
        "foak_year": 2028,
        "ownership": "Public",
        "ticker": "NASDAQ: NKLR",
        "funding": "Listed on Nasdaq through a business combination in 2025 as Terra Innovatum Global N.V.",
        "dc_deal": null,
        "dc_partners": null,
        "dc_deals": null,
        "hq_country": null,
        "hq_region": null,
        "listed": "2025-10-10"
      },
      "sources": [
        {
          "url": "https://www.nasdaq.com/press-release/us-nrc-dockets-terra-innovatums-solotm-micro-modular-reactor-topical-reports",
          "title": "US NRC dockets SOLO topical reports",
          "accessed": "2026-11-11",
          "fields": [
            "design",
            "licensing_detail",
            "licensing_stage",
            "mwe_per_module",
            "ownership",
            "reactor_type",
            "regulators",
            "size_class",
            "ticker"
          ]
        },
        {
          "url": "https://www.sec.gov/Archives/edgar/data/2067627/000121390025111263/ea026594101ex99-2_terra.htm",
          "title": "SEC 8-K: Terra Innovatum Global N.V.",
          "accessed": "2026-11-11",
          "fields": [
            "foak_year",
            "funding",
            "licensing_detail"
          ]
        },
        {
          "url": "https://www.barchart.com/story/news/35351913/terra-innovatum-announces-closing-of-business-combination-with-gsr-iii-acquisition-corp-and-commencement-of-trading-on-nasdaq",
          "title": "Terra Innovatum: business combination closed, NKLR trades from 10 October 2025",
          "accessed": "2026-11-11",
          "fields": [
            "listed"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "terrapower",
      "name": "TerraPower",
      "url": "https://www.terrapower.com/",
      "summary": "Designs Natrium, a 345 MWe sodium-cooled fast reactor with molten-salt storage that can boost output to 500 MWe. Its first plant is under construction at Kemmerer, Wyoming.",
      "hq": "US",
      "tags": [
        "Sodium-cooled",
        "Data-center deal",
        "Construction approved"
      ],
      "fields": {
        "design": "Natrium",
        "reactor_type": "Sodium-cooled",
        "size_class": "Medium",
        "mwe_per_module": 345,
        "mwt_per_module": 840,
        "fuel": null,
        "licensing_stage": "Construction licensed",
        "regulators": "NRC",
        "licensing_detail": "TerraPower announced the NRC Commission vote on 2026-03-04. The NRC project schedule records the construction-permit decision as 2026-03-09. Kemmerer Unit 1 is a commercial sodium-cooled Natrium demonstration plant; construction approval does not authorize operation.",
        "licensing_date": "2026-03-09",
        "foak_site": "Kemmerer, Wyoming (Kemmerer Unit 1), next to a retiring coal plant",
        "foak_year": 2030,
        "ownership": "Private",
        "ticker": null,
        "funding": "$650 million round with NVentures (Nvidia) in 2025; DOE Advanced Reactor Demonstration Program cost-share for Kemmerer.",
        "dc_deal": true,
        "dc_partners": "Meta; Sabey Data Centers",
        "dc_deals": "Meta agreement (2026-01-09) for up to eight Natrium plants: two new units plus rights to six more, up to 2.8 GW (4 GW with storage). Sabey Data Centers signed an MOU on Natrium deployment on 2025-01-21.",
        "hq_country": "United States",
        "hq_region": "North America",
        "listed": null
      },
      "sources": [
        {
          "url": "https://www.nrc.gov/facilities-safety/new-reactors/advanced-reactors/who-were-working-with/past-licensing-activities/kemmerer-power-station-unit-1",
          "title": "NRC: Kemmerer construction-permit decision, 9 March 2026",
          "accessed": "2026-11-11",
          "fields": [
            "licensing_date",
            "licensing_detail",
            "licensing_stage",
            "regulators",
            "foak_site",
            "reactor_type",
            "mwt_per_module"
          ]
        },
        {
          "url": "https://www.terrapower.com/NRC-Approves-Natrium-Reactor-Construction-Permit",
          "title": "TerraPower: NRC approves Natrium construction permit",
          "accessed": "2026-11-11",
          "fields": [
            "design",
            "foak_site",
            "hq_country",
            "hq_region",
            "licensing_date",
            "licensing_detail",
            "licensing_stage",
            "reactor_type",
            "regulators",
            "mwe_per_module",
            "size_class",
            "foak_year"
          ]
        },
        {
          "url": "https://www.power-eng.com/nuclear/bill-gates-terrapower-raises-750-million-for-advanced-nuclear-technologies/",
          "title": "Power Engineering: TerraPower funding",
          "accessed": "2026-11-11",
          "fields": [
            "funding",
            "ownership"
          ]
        },
        {
          "url": "https://www.terrapower.com/terrapower-announces-deal-with-meta",
          "title": "TerraPower and Meta agreement for 8 Natrium plants",
          "accessed": "2026-11-11",
          "fields": [
            "dc_deal",
            "dc_deals",
            "dc_partners"
          ]
        },
        {
          "url": "https://www.terrapower.com/terrapower-and-sabey-data-centers-agreement-for-natrium-wide-scale-deployment",
          "title": "TerraPower and Sabey Data Centers",
          "accessed": "2026-11-11",
          "fields": [
            "dc_deals",
            "dc_partners"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "terrestrial-energy",
      "name": "Terrestrial Energy",
      "url": "https://www.terrestrialenergy.com/",
      "summary": "Listed developer of the Integral Molten Salt Reactor. Its IMSR400 plant pairs two 195 MWe reactors and targets grid power, industrial heat and data centers.",
      "hq": "US",
      "tags": [
        "Molten salt",
        "Listed"
      ],
      "fields": {
        "design": "IMSR400 (two IMSR units)",
        "reactor_type": "Molten salt",
        "size_class": "Small",
        "mwe_per_module": 195,
        "mwt_per_module": null,
        "fuel": "LEU fuel salt",
        "licensing_stage": "Design review",
        "regulators": "CNSC; NRC",
        "licensing_detail": "Completed Phase 2 of the CNSC vendor design review in April 2023 with no fundamental barriers to licensing. NRC has approved IMSR topical reports, including principal design criteria; no US construction permit application filed yet.",
        "licensing_date": "2023-04-01",
        "foak_site": "Texas A&M RELLIS campus, Bryan, Texas (77-acre ground lease, June 2026)",
        "foak_year": null,
        "ownership": "Public",
        "ticker": "NASDAQ: IMSR",
        "funding": "Listed on Nasdaq on 2025-10-29 through a merger with HCM II Acquisition Corp.",
        "dc_deal": null,
        "dc_partners": null,
        "dc_deals": null,
        "hq_country": "United States",
        "hq_region": "North America",
        "listed": "2025-10-29"
      },
      "sources": [
        {
          "url": "https://wnn.world-nuclear.org/articles/terrestrial-smr-completes-canadian-pre-licensing-r",
          "title": "WNN: Terrestrial SMR completes Canadian pre-licensing review",
          "accessed": "2026-11-11",
          "fields": [
            "licensing_date",
            "licensing_detail",
            "licensing_stage",
            "reactor_type",
            "regulators"
          ]
        },
        {
          "url": "https://www.barchart.com/story/news/34718692/nrc-completes-safety-evaluation-and-approves-terrestrial-energy-imsr-principal-design-criteria-including-its-mechanism-for-inherent-reactor-power-control",
          "title": "NRC approves IMSR principal design criteria",
          "accessed": "2026-11-11",
          "fields": [
            "licensing_detail",
            "listed"
          ]
        },
        {
          "url": "https://www.barchart.com/story/news/35743041/terrestrial-energy-inc-completes-business-combination-with-hcm-ii-acquisition-corp",
          "title": "Terrestrial Energy completes business combination",
          "accessed": "2026-11-11",
          "fields": [
            "design",
            "fuel",
            "funding",
            "hq_country",
            "hq_region",
            "mwe_per_module",
            "ownership",
            "size_class",
            "ticker"
          ]
        },
        {
          "url": "https://www.ans.org/news/article-8139/terrestrial-energy-and-texas-am-reach-agreement-on-reactor-siting/",
          "title": "ANS: Terrestrial and Texas A&M siting agreement",
          "accessed": "2026-11-11",
          "fields": [
            "foak_site"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "thorizon",
      "name": "Thorizon",
      "url": "https://thorizon.com/",
      "summary": "Dutch-French developer of Thorizon One, a 100 MWe molten salt reactor built from replaceable cartridges, planned for Zeeland in the Netherlands.",
      "hq": "NL",
      "tags": [
        "Molten salt"
      ],
      "fields": {
        "design": "Thorizon One",
        "reactor_type": "Molten salt",
        "size_class": "Small",
        "mwe_per_module": 100,
        "mwt_per_module": null,
        "fuel": null,
        "licensing_stage": "Pre-licensing",
        "regulators": "ANVS; ASNR",
        "licensing_detail": "Dutch ANVS and French ASN began a joint preparatory review of Thorizon One in 2024 ahead of pre-licence applications.",
        "licensing_date": null,
        "foak_site": "Zeeland, Netherlands; Thorizon Pioneer demonstrator at Petten in 2028",
        "foak_year": 2034,
        "ownership": "Private",
        "ticker": null,
        "funding": "€20 million (March 2025) led by Invest-NL with North Brabant, total €42.5 million; €10 million France 2030 grant; €10 million EU Just Transition Fund for Project ZILT.",
        "dc_deal": null,
        "dc_partners": null,
        "dc_deals": null,
        "hq_country": "Netherlands",
        "hq_region": "Europe",
        "listed": null
      },
      "sources": [
        {
          "url": "https://world-nuclear-news.org/Articles/Joint-preparatory-review-for-Thorizon-One-reactor",
          "title": "WNN: Joint preparatory review for Thorizon One",
          "accessed": "2026-11-11",
          "fields": [
            "design",
            "licensing_detail",
            "licensing_stage",
            "reactor_type",
            "regulators"
          ]
        },
        {
          "url": "https://www.nrgpallas.com/media/nkebdbt2/persbericht-thorizon-overeenkomst-voor-het-bouwen-van-europas-eerste-commerciele-gesmolten-zout-reactor-in-nederland-final_nl.pdf",
          "title": "NRG PALLAS: Thorizon agreement (April 2026)",
          "accessed": "2026-11-11",
          "fields": [
            "foak_site",
            "foak_year",
            "mwe_per_module",
            "size_class"
          ]
        },
        {
          "url": "https://www.world-nuclear-news.org/articles/new-funding-to-advance-thorizon-molten-salt-reactor-development",
          "title": "WNN: New funding for Thorizon",
          "accessed": "2026-11-11",
          "fields": [
            "funding",
            "hq_country",
            "hq_region",
            "ownership"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "valar-atomics",
      "name": "Valar Atomics",
      "url": "https://valaratomics.com/",
      "summary": "Builds the Ward 250, a helium-cooled TRISO-fuelled gas reactor designed for mass production. It was the second reactor to go critical under the DOE Reactor Pilot Program.",
      "hq": "US",
      "tags": [
        "HTGR",
        "Microreactor"
      ],
      "fields": {
        "design": "Ward 250",
        "reactor_type": "HTGR",
        "size_class": "Micro",
        "mwe_per_module": 5,
        "mwt_per_module": null,
        "fuel": "HALEU TRISO",
        "licensing_stage": "DOE test authorization",
        "regulators": "DOE",
        "licensing_detail": "NOVA core reached zero-power criticality with Los Alamos (NCERC) in November 2025. Ward 250 went critical at the Utah San Rafael Energy Lab in June 2026, the second DOE pilot reactor to do so and the first outside a national lab.",
        "licensing_date": null,
        "foak_site": "Utah San Rafael Energy Lab, near Orangeville, Utah",
        "foak_year": 2026,
        "ownership": "Private",
        "ticker": null,
        "funding": "$130 million Series A (November 2025); $1 billion Series B led by Sequoia Capital (August 2026).",
        "dc_deal": null,
        "dc_partners": null,
        "dc_deals": null,
        "hq_country": "United States",
        "hq_region": "North America",
        "listed": null
      },
      "sources": [
        {
          "url": "https://www.powermag.com/valar-atomics-ward-250-becomes-second-reactor-to-go-critical-under-doe-pilot-program/",
          "title": "POWER: Ward 250 second reactor to go critical",
          "accessed": "2026-11-11",
          "fields": [
            "design",
            "foak_site",
            "foak_year",
            "fuel",
            "licensing_detail",
            "licensing_stage",
            "mwe_per_module",
            "reactor_type",
            "regulators",
            "size_class"
          ]
        },
        {
          "url": "https://www.ans.org/news/2025-11-18/article-7548/valar-achieves-cold-criticality-at-lanl/",
          "title": "ANS: Valar achieves cold criticality at LANL",
          "accessed": "2026-11-11",
          "fields": [
            "licensing_detail"
          ]
        },
        {
          "url": "https://www.ans.org/news/article-7540/new-financing-round-benefits-valar/",
          "title": "ANS: New financing round benefits Valar",
          "accessed": "2026-11-11",
          "fields": [
            "funding",
            "hq_country",
            "hq_region",
            "ownership"
          ]
        },
        {
          "url": "https://valaratomics.com/docs/Announcing-our-1B-Series-B-Led-By-Sequoia",
          "title": "Valar: $1B Series B led by Sequoia",
          "accessed": "2026-11-11",
          "fields": [
            "funding"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "westinghouse",
      "name": "Westinghouse Electric Company",
      "url": "https://westinghousenuclear.com/",
      "summary": "Reactor vendor behind the AP1000. It markets the AP300, a 375 MWe single-loop PWR built from AP1000 technology, and eVinci, a heat-pipe microreactor.",
      "hq": "US",
      "tags": [
        "LWR",
        "Data-center deal"
      ],
      "fields": {
        "design": "AP300; eVinci",
        "reactor_type": "LWR",
        "size_class": "Medium",
        "mwe_per_module": 375,
        "mwt_per_module": 990,
        "fuel": "AP1000 fuel technology",
        "licensing_stage": "Pre-licensing",
        "regulators": "NRC",
        "licensing_detail": "NRC is engaged in pre-application activities for Westinghouse’s AP300 design certification application. eVinci is a separate design with its own NRC pre-application engagement; neither project page is a construction permit.",
        "licensing_date": null,
        "foak_site": "AP300 in operation by the early 2030s (Westinghouse target)",
        "foak_year": null,
        "ownership": "Subsidiary",
        "ticker": null,
        "funding": "Owned 51% by Brookfield and 49% by Cameco. Signed an $80 billion AP1000 deal with the US government in October 2025.",
        "dc_deal": true,
        "dc_partners": "Data4",
        "dc_deals": "Data4 selected the AP300 in March 2025 to evaluate deployment at one of its future European data centers (MoU).",
        "hq_country": "United States",
        "hq_region": "North America",
        "listed": null
      },
      "sources": [
        {
          "url": "https://westinghousenuclear.com/data-sheet-library/ap300-smr-most-advanced-proven-readily-deployable-smr-solution/",
          "title": "Westinghouse: current AP300 data sheet, 375 MWe / 990 MWt",
          "accessed": "2026-11-11",
          "fields": [
            "design",
            "mwe_per_module",
            "mwt_per_module",
            "reactor_type",
            "size_class",
            "fuel"
          ]
        },
        {
          "url": "https://www.businesswire.com/news/home/20250331678087/en/Westinghouse-eVinci-Design-Reaches-Key-US-Licensing-Milestone",
          "title": "Westinghouse: eVinci licensing milestone",
          "accessed": "2026-11-11",
          "fields": [
            "design",
            "licensing_detail"
          ]
        },
        {
          "url": "https://info.westinghousenuclear.com/news/westinghouse-data4-to-collaborate-on-european-data-center-project",
          "title": "Westinghouse and Data4",
          "accessed": "2026-11-11",
          "fields": [
            "dc_deal",
            "dc_deals",
            "dc_partners",
            "foak_site",
            "hq_country",
            "hq_region"
          ]
        },
        {
          "url": "https://www.ans.org/news/article-7499/westinghouse-signs-80b-contract-to-meet-ai-demand",
          "title": "ANS: Westinghouse $80B contract",
          "accessed": "2026-11-11",
          "fields": [
            "funding",
            "ownership"
          ]
        },
        {
          "url": "https://www.nrc.gov/facilities-safety/new-reactors/advanced-reactors/who-were-working-with/pre-application-activities/westinghouse-ap300",
          "title": "NRC: AP300 pre-application activities",
          "accessed": "2026-11-11",
          "fields": [
            "licensing_stage",
            "licensing_detail",
            "regulators"
          ]
        },
        {
          "url": "https://www.cameco.com/businesses/westinghouse",
          "title": "Cameco: Westinghouse ownership (49% Cameco, 51% Brookfield)",
          "accessed": "2026-11-11",
          "fields": [
            "ownership",
            "funding"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    },
    {
      "id": "x-energy",
      "name": "X-energy",
      "url": "https://x-energy.com/",
      "summary": "Designs the Xe-100, an 80 MWe pebble-bed high-temperature gas reactor, and makes its own TRISO-X fuel. Dow’s Long Mott project in Texas and Amazon’s Cascade project in Washington are its first plants.",
      "hq": "US",
      "tags": [
        "HTGR",
        "Data-center deal"
      ],
      "fields": {
        "design": "Xe-100",
        "reactor_type": "HTGR",
        "size_class": "Small",
        "mwe_per_module": 80,
        "mwt_per_module": null,
        "fuel": "TRISO-X pebbles",
        "licensing_stage": "Construction licensed",
        "regulators": "NRC",
        "licensing_detail": "Long Mott Energy (Dow) applied on 2025-03-31; NRC docketed the application on 2025-05-12, issued the environmental assessment on 2026-05-18 and approved the construction permit on 2026-11-09. Dow’s board approval of the build is the next step.",
        "licensing_date": "2026-11-09",
        "foak_site": "Long Mott, Seadrift, Texas (Dow): four Xe-100s",
        "foak_year": null,
        "ownership": "Public",
        "ticker": "NASDAQ: XE",
        "funding": "Nasdaq trading began 2026-04-24 as XE; IPO settled 2026-04-27, raising approximately $1.1 billion net.",
        "dc_deal": true,
        "dc_partners": "Amazon",
        "dc_deals": "Amazon and X-energy plan more than 5 GW of Xe-100 projects in the US by 2039; the first, Energy Northwest’s Cascade facility in Washington, is planned at 960 MW from 12 reactors.",
        "hq_country": "United States",
        "hq_region": "North America",
        "listed": "2026-04-24"
      },
      "sources": [
        {
          "url": "https://investors.x-energy.com/node/6986/pdf",
          "title": "X-energy: first-quarter 2026 results confirm Nasdaq trading and IPO settlement",
          "accessed": "2026-11-11",
          "fields": [
            "ownership",
            "ticker",
            "funding"
          ]
        },
        {
          "url": "https://www.nrc.gov/reactors/new-reactors/advanced/who-were-working-with/applicant-projects/long-mott.html",
          "title": "NRC: Long Mott",
          "accessed": "2026-11-11",
          "fields": [
            "design",
            "foak_site",
            "licensing_date",
            "licensing_detail",
            "licensing_stage",
            "reactor_type",
            "regulators"
          ]
        },
        {
          "url": "https://www.ans.org/news/2026-08-17/article-8297/xenergy-terrapower-share-updates-on-advanced-reactor-projects/",
          "title": "ANS: X-energy, TerraPower updates",
          "accessed": "2026-11-11",
          "fields": [
            "dc_deals",
            "licensing_detail"
          ]
        },
        {
          "url": "https://www.businesswire.com/news/home/20251124774353/en/X-energy-Closes-Oversubscribed-700-Million-Series-D-Financing-Round-to-Continue-Expansion-to-Meet-Global-Energy-Demand",
          "title": "X-energy: $700M Series D",
          "accessed": "2026-11-11",
          "fields": [
            "fuel",
            "hq_country",
            "hq_region"
          ]
        },
        {
          "url": "https://www.latitudemedia.com/news/smr-developer-x-energy-secures-a-700-million-series-d/",
          "title": "Latitude Media: X-energy Series D",
          "accessed": "2026-11-11",
          "fields": [
            "dc_deal",
            "dc_deals",
            "dc_partners",
            "mwe_per_module",
            "size_class"
          ]
        },
        {
          "url": "https://corporate.dow.com/en-us/news/press-releases/dows-long-mott-generating-station-receives-nrc-construction-permit.html",
          "title": "Dow: Long Mott Generating Station receives NRC construction permit (2026-11-09)",
          "accessed": "2026-11-11",
          "fields": [
            "licensing_stage",
            "licensing_date",
            "licensing_detail",
            "foak_site"
          ]
        },
        {
          "url": "https://thenextweb.com/news/x-energy-ipo-1-billion-amazon",
          "title": "The Next Web: X-energy debuts on Nasdaq as XE (24 April 2026)",
          "accessed": "2026-11-11",
          "fields": [
            "listed"
          ]
        }
      ],
      "verifiedAt": "2026-11-11",
      "featured": false
    }
  ]
}
